Though Namma Metro is preparing for a June-launch of services between Magadi Road and Mysore Road on the East-West Corridor, for the first time in the history of the Bengaluru Metro project, Bangalore Metro Rail Corporation (BMRCL) will run a train through a tunnel on March 12. The train will be operated on the 4.5-km tunnel between Cubbon Park station and Magadi Road station.The train will be operated at a snail´s pace for its maiden trip on the underground route. After the train emerges out of the tunnel, trial runs for it will commence on the 6.4-km stretch between Magadi Road and Mysore Road.
FlashNews:
India’s Solar Diplomacy Gains Momentum as Minister Joshi Calls for Equitable Energy Transition at ISA Plenary
Solar for All: President Murmu Urges Inclusive Energy Revolution at ISA Plenary
From Code to Concrete: Why the Smart Infrastructure Boom Needs Bobs to Become Tech Builders
Toll Revenues Surge to ₹491.9 Billion in Jan-Sept 2025, Driven by Higher Traffic and Revised User Fees: ICRA Analytics
IMW 2025: India positions itself as maritime bridge between Indo-Pacific and Global South, says Amit Shah
IMW 2025: Gadkari Calls for Private Innovation in Ship Financing, Launches Maritime Vision Report
IndiGo Reconnects with China, Crosses Long-Haul Milestone with Non-Stop London Service
India to Host Asia-Pacific Aircraft Accident Investigation Meet for the First Time
Nithia Capital Acquires Topworth Urja for ₹3 Billion, Expands Long Steel Portfolio
Delhi Airport Reopens Future-Ready Terminal 2 to Boost Passenger Flow and Airline Efficiency
ICRA Forecasts Steady Power Demand Growth in FY2026 Amid Monsoon Drag and Renewable Surge
IndiGo Retains Dominance in Indian Skies as Four New Airports Join Winter Schedule 2025
Railways Deploys 6,181 Special Trains for Post-Chhath Return; Bihar Stations Reinforced for Festive Rush
NTPC and EIL Partner to Develop Coal-to-SNG Facility for Grid Stability and Clean Energy Transition
NHAI to Display Toll Pass Details at Fee Plazas to Boost Transparency and Ease Travel
TEC Signs MoU with IIT-Hyderabad to Drive Indigenous Telecom Standards
Grid of Change: Odisha Model and Reimagining Power Sector Reforms Through PPPs
SAEL to Procure 2 MT of Paddy Waste for Clean Energy Push, Targets 300,000 Tonnes CO₂e Avoidance
Vikram Solar Secures 148.9 MW Module Order from Sunsure Energy for Maharashtra and Uttar Pradesh Projects
Home » Bangalore Metro to chug through tunnel
Bangalore Metro to chug through tunnel
Roads & Highways
March 1, 2015March 1, 2015


Leave a Reply
You must be logged in to post a comment.