Schneider Electric has commissioned a 720 kWp capacity solar power project at its manufacturing facility in Vadodara, Gujarat. The solar project, built on a rooftop area of 6,000 square meters, covers almost 45 per cent of the total factory load and will produce over 1.05 million units of electricity per year. This would help cut power costs by as much as 20-25 per cent annually. Further, Schneider Electric will be able to cut its carbon dioxide emissions by 1,018 tonnes per year, which is equivalent to planting 50,000 trees.
FlashNews:
India’s Rajya Sabha Passes Bills of Lading, 2025: A Landmark Maritime Reform
Rail Car Inspections Begin on Vaitarna-Kharbo Stretch; Western DFC Nears Completion
DEL Vibes: Immersive Cultural Showcase Launched at Delhi International Airport
CS TECH Ai Named PMC for ₹58.1 Million Sewage Revamp in Nashik
India’s ₹35 Trillion Energy Push Hinges on States, Says Puri at Urja Varta
Lending Versatility to Modern Infrastructure with Coated Steel
India Post to Grow Revenue by 30% in FY26 under Scindia’s Vision for Performance-Driven Public Service
Solar Now Far Cheaper Than Conventional Energy as Tariffs Fall: Joshi
India Surpasses Clean Energy Goal with 50% of Grid Now Powered by Non-Fossil Sources
Mumbai-Ahmedabad Bullet Train to Launch with Japan’s Next-Gen Shinkansen Technology
From Trade to Tourism, Sonowal Envisions a New Global Role for BIMSTEC
Railways to Begin Massive CCTV Rollout Across Trains to Boost Onboard Security
Ceinsys Tech Wins ₹1.15 Billion MMRDA Contract for Real-Time Infrastructure Monitoring Platform
Siemens Secures ₹7.73 Billion Contract for Nagpur Metro’s Advanced Signalling and Telecom Systems
DFCCIL Launches India’s First Private Gati Shakti Cargo Terminal on Western Freight Corridor
India Clears Elon Musk’s Starlink for Satellite Internet Rollout
GAIL, OIL Extend 15-Year Gas Supply Pact for Rajasthan Fields
Invest in IREDA Bonds to Support India’s Green Energy Transition and Save Tax
India Invites Feedback on Oil & Gas Reforms Ahead of Landmark OALP Round X: Hardeep Singh Puri
Home » Schneider Electric India commissions 720 kWp solar plant
Schneider Electric India commissions 720 kWp solar plant
Power & New and Renewable Energy
July 28, 2017July 28, 2017

Leave a Reply
You must be logged in to post a comment.