The airport terminal at Ozar, about 20 km from Nashik, is scheduled to be ready by the end of March. The state government and Hindustan Aeronautics Ltd (HAL) are jointly upgrading the airport at a cost of Rs 80 crore. The airport has capacity to handle 300 passengers at a time and around six planes can be landed there. The building will be totally air-conditioned and will have all facilities and amenities as per the global norms.
FlashNews:
PIDG Expands India Portfolio, Mobilises ₹29 Billion for Sustainable Infrastructure
Anant Goenka Takes Charge as FICCI President; Centenary Logo Unveiled by Piyush Goyal
InfraPandit Awards 2025 Spotlight Doctoral Research Driving India’s Infrastructure Future
India Eyes US Trade Framework Deal by Year-End; FDI Strategy Expands Beyond Market Access
Centre Weighs Infra Status for Hotels to Unlock Tourism Investment: Shekhawat
India’s GDP Surges 8% in H1 FY26, Driven by Infra and Services
SIA‑India Pushes Bold Budget, Hybrid PLI to Power Space Sector Takeoff
South Asia Must Scale Hydro, Storage and Power Trading for Grid Integration: CEA Chief
India Can Save $204 Billion in Infra Pipeline with Better DPR Planning: Vector Consulting
Prime Minister Modi Inaugurates Skyroot’s Rocket Factory; Company Targets $21 Billion Launch Market
IWAI Signs ₹13.5 Billion MoUs to Boost Ganga Waterway in Uttar Pradesh
MOVIN Launches Healthcare Logistics Vertical to Tap India’s $638 Billion Industry
Atlanta Electricals Secures ₹2.98 Billion Transformer Orders from GETCO
Waaree Group Wins 10 MWh BESS Order in Tamil Nadu, Expands Domestic Storage Manufacturing
Cabinet Approves ₹27.8 Billion Rail Multitracking to Boost Gujarat and Maharashtra Connectivity
BC Jindal Group Secures 150 MW RTC Power Deal with SECI
India’s Data Centre Revenue to Hit ₹200 Billion By FY2028, Driven by AI, Cloud and 5G: Crisil Ratings
Sanchar Saathi Recovers 50,000 Phones in October; Crosses 700,000 Nationwide Since Launch
Akasa Air Expands Northeast Connectivity, Adds Dibrugarh as 32nd Destination
Home » airport terminal

