Home » Bharat Heavy Electrical Limited

Tag: Bharat Heavy Electrical Limited

Post
TTPS Unit III resumes

TTPS Unit III resumes

Unit III of Tuticorin Thermal Power Station (TTPS), has resumed production after overhauling. Prior to resumption of production, safety valve floating test and other mandatory checks were carried out.