The Cabinet Committee on Economic Affairs (CCEA) on May 17th 2017 approved the Modified Coal Linkage Policy for the power sector. Under this policy, all power plants will be assured of adequate supply of coal at competitive prices
FlashNews:
IRB Group Reports ₹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for Punatsangchhu‑II, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer India’s First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lal’s 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Japan’s JFE Engineering Invests ¥750 Million in Antony Waste; First FDI in India’s Waste-to-Energy Sector
SDHI Wins India’s First Ammonia Dual‑Fuel Bulk Carrier Order
SAME and IndiGo Launch Cadet AME Programme to Train India’s Next Aviation Engineers
IndiGo Revises Fuel Charges as ATF Costs Soar
Putting Turbulence Behind IndiGo Appoints Willie Walsh to Drive Future Global Growth
DFCCIL Completes Trial Run on Newly Electrified JNPA-Vaitarna Freight Corridor
Sourav Ganguly, Indian Cricket’s ‘Dada’, Named JAKSON Group’s First Brand Ambassador
RAHSTA Roundtable Sets Agenda for Smarter, Safer Highways
CTS Roundtable Charts Tech-Led Roadmap for Construction
Drone Startup BonV Aero Hails Rangeilunda’s Integrated Drone Testing
India Orders Boost in LPG Output to Safeguard Household Supply
“Entrepreneurial hunger, technology enablement to drive massive growth”
Tata Power Odisha Discoms Empower Women with ‘Nua Arambha’ Careers Initiative
Tag: Coal Linkage
Policy on auction of coal linkages in 2-3 months
Policy on auctioning of coal linkages to the power sector is likely to be finalised in 2-3 months, the government said. Proposed policy on auction of coal linkages to power sector will take two to three months,' Coal and Power Minister Piyush Goyal told reporters.
Power firms await coal linkage policy
Power producers have made a fresh appeal to the Centre to release a coal linkage policy soon. They have argued the coal linkage policy announced by the previous UPA government had covered 78,000 MW to be commercially operational by March 31, 2015.
Assured coal supply for stuck power plants
The order refers to the plants which are part of the tranche of projects totalling capacity of 78,000 Mw for which a presidential directive was issued in 2013.The central government will bail out close to 21,400 Mw of power plants by assuring coal linkage through new fuel supply agreements (FSAs).
Coal linkage for PPA developers
Given the litigation over the cap on fixed costs, the government would desist from auctioning more captive coal blocks to power companies
GVK gets green nod to import coal
GVK Power (Goindwal Sahib) Ltd, a subsidiary of GVK Power and Infrastructure, has got permission from the Environment Ministry to import coal from South Africa as a ´stop gap´ arrangement in case the company fails to get coal from its captive mines in Tokisud North sub-block in Jharkhand.

