The Maharashtra State Power Generation Company (MAHAGENCO) has tendered 110 MW of solar in two separate tenders.
FlashNews:
India Launches First All‑Electric Tug at Deendayal Port, Accelerates Green Maritime Shift
Bharatmala Pariyojana Executes 61% of Phase‑I Highway Targets, Boosts Freight Speed and Connectivity
Waaree Tops India’s Solar Module Shipments in Q3 2025, Reinforces Global Competitiveness
AISATS Expands Nationwide, Launches Ground Handling at Cochin Airport with Future‑Ready Tech
TIL Bags ₹2 Billion Orders Across Defence and Logistics, Validates Dual-Sector Strategy
Indian Railways to Roll Out OTP‑Based Tatkal Window Tickets Nationwide to Curb Misuse
Sanchar Saathi Row: Scindia Defends App as Voluntary, Transparent and Consumer‑Protective Amid Privacy Debate
REIAs Issue 67.5 GW Renewable Energy LoAs Since April 2023 with Zero Cancellations: Joshi
Rail Freight Rises 4.2% in November as Steel, Iron Ore and Fertiliser Volumes Surge
NHAI Partners Reliance Jio to Launch Telecom‑Based Safety Alerts on National Highways
Delhi Airport Becomes India’s First Water‑Positive Major Aviation Hub
Civil Aviation Minister Confirms GPS Spoofing at Delhi Airport; Cyber Threats Spread to Major Hubs
India’s Power Capacity Crosses 505,000 MW, Clean Energy Transition Accelerates
Air India Express Launches Twice-Daily Nagpur-Bengaluru Flights, Expands Maharashtra Network
India to Expand Refining Capacity to 309.5 MMTPA by 2030, Accelerates Biofuel and Green Hydrogen Push
Air India Expands China Presence with TAM Group Appointment as Passenger GSA
DFCCIL Trial Run Paves Way for JNPA Link to Western Dedicated Freight Corridor
India Secures Top Vote in IMO Council Re‑Election for 2026-27
IndiGo Expands Domestic Connectivity from Navi Mumbai International Airport
Tag: commissioning
Hartek Power bags 1,025 MW solar grid EPC orders in FY17
Chandigarh-based Hartek Power has said that its solar grid EPC order size has increased by 733 per cent to 1,025 MW in 2016-17, compared to 123 MW worth of orders the company had received in the previous fiscal.
BHEL bags Rs.1202 crore power project order
State-run BHEL has bagged a Rs 1,202-crore order for 370 MW gas-based combined cycle power project in Karnataka.
Gamesa signs 100 MW windpower project
Spain-based wind turbine maker Gamesa has bagged a 100 MW wind power project in Maharashtra from Orange Renewable Power.
Technip bags -C100 mn ONGC order
Engineering and construction firm Technip, which specialises in subsea construction, has got a 100-million euro contract from Oil and Natural Gas Corporation (ONGC) to build an onshore oil and gas terminal in Andhra Pradesh.
ABFPL bags NTPC contract
Alstom Bharat Forge Power Ltd (ABFPL), the joint venture company of Alstom and Bharat Forge has bagged contract worth Rs 1,136.5 crore from NTPC for the supply of plant equipment for the Tanda coal power plant in Uttar Pradesh.
Siemens bags PowerGrid contract
Siemens has bagged a contract worth Rs 411 crore from Power Grid Corporation (PGCIL) for setting up three Static Var Compensators (SVCs), each in Punjab, Rajasthan and Jammu & Kashmir.
JSPL sets up 2.5 mn t capacity in Angul project
A 2.5 million tonne Steel Melting Shop (SMS) and allied unit have been commissioned by Jindal Steel & Power (JSPL) as part of its 6 million tonne per annum (mtpa) greenfield integrated steel project in Angul, Odisha. Dinesh Saraogi, Executive Director of JSPL, Angul Unit said with this landmark achievement, the firm completed the 2.5 mn tpa steel production capacity in the f
SJVN plans power projects worth Rs 9.8 bn in FY14
RP Singh, Chairman of SJVN informed that the firm may invest about Rs 986 crore on several projects, including wind and thermal during 2013-14 compared to Rs 796 crore invested in the previous fiscal. Singh informed this during a conference call with analysts. Most of the Rs 796 crore spent last year went to its 412 mw Rampur hydro electric project in Himachal Prad
AP govt to add 4 gw generation capacity to meet demand
By the end of the financial year 2013-14, the Andhra Pradesh government aims to add at least 4,000 mw of power production capacity in order to meet the shortage of electricity. The state government's power generation firm AP Genco is said to be in the advanced stage of commissioning at least three projects, including two units

