Home » Drain

Tag: Drain

Post
Beating the clock

Beating the clock

The road section DBL worked upon was basically one part of the full section of 150 km. The authorities floated open a tender for this 150 km stretch of road in three segments - km 0 to 43, km 43 to 93 and km 99 to 150 at the same time, out of which we received the stretch between km 43 to 93.