The National Highways Authority of India (NHAI) awarded four-laning contract for the Lucknow-Sultanpur highway section in Uttar Pradesh to Dilip Buildcon.
FlashNews:
IndiGo to Build Navi Mumbai International Hub with 12 Overseas Routes from February 2027
Akasa Air Launches Daily Vizag-Delhi Flights, Boosting Connectivity to Andhra Pradesh
SMFCL Targets ā¹602 Billion Disbursals by 2031 as Maritime Financing Ecosystem Takes Shape
India Must Build a Complete Maritime Ecosystem to Unlock Shipbuilding Ambitions: TK Ramachandran
Geospatial Workforce Expansion Critical to Viksit Bharat Vision: Experts
Agrivoltaics: States Court Investors as Farm-Solar Adoption Accelerates
Sonowal Urges Polish Firms to Build and Invest in India as Strategic Ties Deepen
Indian Railways Records Highest-Ever Coal Loading Growth in October
Climate Fund responsAbility Investment Fuels Navitasā Solar Manufacturing Expansion
Air India Begins Construction of Advanced MRO Facility at Delhi Airport
TVS ILP Leases 80,000 Sq Ft Visakhapatnam Warehouse to Yokohama Groupās ATC Tires
Viasat Names Six Finalists for Space for Good India Challenge 2026 Finals
India Prepares Mega Agrivoltaics Push as Farmland Solar Potential Surpasses 2050 Power Demand
From Jaipur to Russia: RUSAL Opens New Opportunities for Indian Workers
Sovereign Cloud Emerges as Indiaās AIāReady Digital Foundation
Shivalaya Construction Secures ERESā47 Transmission SPV for Eastern Grid Expansion from RECPDCL
Indiaās Open Mobility Pioneer Takes Its RideāHailing Model to Europe
NTPC, Africa50 Join Forces to Develop Power Projects Across Africa
NHAI Introduces Independent Design Checks for Major Bridges and Critical Highway Structures
Tag: four-laning
NHAI awards Rs 2,845 crore UP four-laning contract to Dilip Buildcon
The National Highways Authority of India (NHAI) has awarded the four-laning contract for the LucknowĆāSultanpur highway section in Uttar Pradesh to Dilip Buildcon.
Dilip Buildcon bags Rs.2,016 crore road project in UP
Infrastructure firm Dilip Buildcon has said that it has bagged a Rs.2,016 crore road project in Uttar Pradesh. ĆĀ“The National Highways Authority of India has declared the company as the selected bidder for four-laning of Lucknow-Sultanpur section of NH-56 from 11.50 km to 134.70 km in the state of Uttar Pradesh under NHDP Phase IV on a hybrid annuity basis at a project cost of Rs.2,016 crore,ĆĀ“
Four-laning of Gaya-Biharsharif road approved
The Cabinet Committee on Economic Affairs has approved the project for the development of four laning of 93 kms. (approximately) long Gaya-Hisua-Rajgir-Nalanda-Biharsharif section on National Highway-82 in Bihar.
Nod to 4-laning of A’bad-Yedeshi h’way at Rs 2,406.63 cr
The Cabinet Committee on Economic Affairs has approved four-laning of the Aurangabad-Yedeshi section of National Highway-211 in Maharashtra. The road work will be taken up under the National Highways Development Project (NHDP) Phase IV on Build, Operate and Transfer (BOT-Annuity) in Design, Build, Finance, Operate and Transfer (DBFOT) pattern.
Nod to 4-laning of h’way in Assam at Rs 522 cr
The Cabinet Committee on Economic Affairs (CCEA) has given its approval for four-laning of the Demow to Bogibil section of National Highway-37 in Assam under the Special Accelerated Road Development Programme in North Eastern Region (SARDP-NE) Phase ĆāAĆā on Build, Operate and Transfer (BOT-Annuity) in Design, Build, Finance, Operate and Transfer (DBFOT) pattern.
Rs 2,029 cr for 4-laning of Kaithal-Rajasthan border h’way
The Union Cabinet Committee on Economic Affairs has given its approval for four-laning of the Kaithal Rajasthan border section of National Highway-152/65 in Haryana under the National Highways Development Project (NHDP) Phase IV, on Design, Build, Finance, Operate and Transfer (BOT/DBFOT) basis in Build-Operate-Transfer (BOT) (Toll) mode of delivery.
Goa govt tenders 4-laning of Ribandar bypass road
The Goa Public Works Department (PWD) has tendered the project for four-laning the Ribandar bypass road starting from the Panaji-Merces junction to the Ela junction in Old Goa. The project involves four-laning of 9.7 km stretch of the NH 4-A and the government has sanctioned the project for an amount of 126.1 crore.
NHAI says 70% land available for NH31D four-laning
The data by National Highways Authority of India (NHAI) shows that nearly 70 per cent of the land required for four-laning NH31D is already available, but because of land problems, 327 hectares has not been acquired yet. NHAI has given the data to the Union Ministry of Economic Affairs for action. The total land required to make the highway four-lane is 1,072 hectares (2,648 acres), NHAI said.
Centre gives nod to road development works in Arunachal
The Union government has given its approval for the
four-laning of the road from Itanagar to Banderdewa and double laning from Itanagar to Jote for better connectivity with Itanagar, the Arunchal Pradesh state capital. The development came when Vijay Chibber, Secretary of Union Ministry of Road Transport and Highways (MoRTH), met Arunachal Pradesh Chief Minister Nabam Tuki and gave his in principle approval for the road works in the state.
- 1
- 2

