The Greater Cochin Development Authority (GCDA) will submit the alignment of the proposed 64-km ring road connecting Chatiyath and Panangad before the Ports Department for approval. Since about 10.5 km stretch of the road between Chatiyath and Varapuzha passes through coastal areas, GCDA would require the approval from the Ports Department.
FlashNews:
Electricity futures key to managing power price volatility”: NSE’s Sriram Krishnan
InfraPandit Awards to Honour Doctoral Excellence in Infrastructure
REC Wins Leading CSR and Sustainability Award for Healthcare Support
HAL Set to Enter New Global Space Race with SSLV Contract Win
Multimodal Logistics: Optimising Assets, Strengthening Supply Chains
Gadkari Announces FASTag Annual Pass to Ease Private Vehicle Movement from Independence Day
Air India 171 Crash: A Definitive Inflection Point for Indian Aviation
REC Reports Strong Profit Growth
GAIL Reports Record Profit Surge
India Calls for Inclusive Energy Governance at BRICS Meet
Mumbai-Ahmedabad Bullet Train’s 300 km Viaduct Milestone
India Revokes Security Clearance to Turkish Firm Çelebi
Major Ports Handle Record Cargo Throughput in FY2025
India Committed to Unlocking Energy Potential: Puri
Gaganyaan Scheduled for 2027 Launch
Defence Budget Set for Rs.500 Billion Top-up
Operation Sindoor: The Indigenous Edge
Securing India’s New Crown Jewels
Logistics parks, multimodal cargo hubs poised for rapid growth
Tag: Greater Cochin Development Authority
Kochi gives ambitious ring road project a push
The Greater Cochin Development Authority (GCDA) will submit the alignment of the proposed 64-km ring road connecting Chatiyath and Panangad before the Ports Department for approval. Since about 10.5 km stretch of the road between Chatiyath and Varapuzha passes through coastal areas, GCDA would require the approval from the Ports Department.
Bridge on pillers for Kochi Marine Drive Phase II
In Kochi, the much-hyped second phase development of the Marine Drive by the Greater Cochin Development Authority has hit an environmental road block. Since reclamation of the backwaters is not possible due to CRZ norms, the GCDA is now looking at constructing the road from Goshree Island Development Authority land near the High Court, to Varappuzha container road, on pillars erected in the backwaters, thus avoiding reclamation.