Cargo volume handled by Kolkata Port Trust (KoPT) stood at 39.88 million tonne (mn t) in 2012-13, which is 7.79 percent lower than 43.25 mn t in the previous fiscal. In 2012-13, cargo throughput attained by Kolkata Dock System (KDS) declined 3.5 percent at 11.8 mn t. On the other hand, cargo handled by Haldia Dock contracted 9.4 percent to 28.08 mn t during the fiscal. Repo
FlashNews:
Vizhinjam Expansion Strengthens India’s Maritime Competitiveness: Sonowal
Tata Power Odisha Discoms Secure Top National Rankings for Third Consecutive Year
SDHI Secures $227 Million Chemical Tanker Deal, Revives India’s Commercial Shipbuilding
India’s Energy Transition Sets Global Pace: Pralhad Joshi at Davos
IWDC Clears ₹15 Billion Projects to Boost Green Mobility, Cargo and River Tourism
World Bank Approves $815 Million Financing for Tata Power-DGPC Dorjilung Hydropower Project in Bhutan
Indian Railways Deploys Humanoid Robot ASC ARJUN at Visakhapatnam for Smart Station Security
India’s Power Grid Crosses 500,000 Circuit Km, Marks 71.6% Growth Since 2014
India Inc Optimistic on Growth, Flags Infrastructure, Defence and Export Priorities: FICCI Survey
NHAI, Konkan Railway Ink MoU to Boost Integrated Road‑Rail Infrastructure Development
DGCA Digitises Pilot Licensing with Electronic ATPL Services to Strengthen Aviation Ecosystem
Power Minister Calls for Financially Strong Discoms to Drive India’s Energy Future
BLR Airport Launches Gate Z, India’s First Social Lounge Redefining the Airport Experience
MoPNG Highlights Financing Strength, Regulatory Reforms Ahead of New Upstream Bid Rounds
ABB India Modernises BPCL’s Vadinar‑Bina Pipeline for Uninterrupted Operations
Vaishnaw Projects 6-8% Growth, Highlights Reform Momentum at Davos
Aerem Solutions Secures $15 Million to Drive Distributed Solar Adoption Across India
India Showcases Energy Transition at Davos: Joshi Calls for Global Collaboration
Indian Railways Expands High-Speed Track Network, Boosts Safety with Modernisation
Home » Haldia Dock II
Tag: Haldia Dock II
CCEA clears Rs 17 bn port project
The Cabinet Committee on Economic Affairs (CCEA) cleared the Rs 1,707 crore multi-purpose berths and mechanised berths project at Kolkata Port Trust. These projects, which would enhance the port cargo capacity by 23.4 million tonne (mn t), would come up at Haldia Dock II (North) and Haldia Dock II (

