Commercial operation of the first 1,000 MW unit at Kudankulam Nuclear Power Project (KNPP) is expected to happen only next year with the Central Electricity Regulatory
FlashNews:
Small is Beautiful: IFFCO Reports Record Profit for Third Consecutive Year as Nano Fertiliser Sales Surge
Operation Sindoor: Airspace Restrictions in the Age of Cross-Border Tensions
REC Profit at ₹15,713 crore for FY25
Shri Jitendra Srivastava assumes charge as CMD, REC Limited
India’s Aerotropolis Plans Get Further Boost with Hisar Airport
REC Limited Signs MoU with MMRDA for ₹1 Lakh Crore Investment in Mumbai Metropolitan Region (MMR)
NBCC CMD K.P. Mahadevaswamy Assumes Chairmanship of SCOPE
Hindalco to be a force for good with engineered solutions transformation: Kumarmangalam Birla
HSR Needs Fast Tracking
RECPDCL Handovers Ratle Kiru Power Transmission Limited, a SPV of Transmission Project, to IndiGrid 2 Private Limited
RECPDCL Handovers 3 Nos. SPVs of transmission projects viz. Banaskantha Transco Limited, Kurnool-IV Transmission Limited & Rajasthan V Power Transmission Limited to Power Grid Corporation of India Limited
Showcasing India’s Supply Chain Revolution
Highlighting the Future of Smart, Sustainable Infra
Driving Sustainability Through Innovation
REC Signs ₹18,360 Cr MoU with Govt. of Kerala for Pump Storage Projects
IIFCL Launches its Gender Equality and Social Inclusion (GESI) Cell on the occasion of International Women’s Day 2025.
IIFCL and CBI Sign Expression of Interest to promote Sustainable Infrastructure Financing in India
CCI India presents 1st edition of CEO Round Table Conference on Agriculture
Jayesh Ranjan & Cement Expo Forum Leaders converge in Hyderabad
Home » Kudankulam Nuclear Power Project
Tag: Kudankulam Nuclear Power Project
KKNP plant generates 200 MW
The first unit of Kudankulam Nuclear Power Project (KNPP) is now generating about 200 MW, states a Power System Operation Corporation (PSOC) report. the KNPP's first unit, which was on a test run, generated 165 MW. The KNPP's first unit was reconnected to the grid late on October 25. By next November.