Highways have been largely on an upswing. We have awaÂrded-or set to award upon opening bids-4,500 km, and will be awarding a minimum of 3,000 km by the end of this fiscal. The industry has been gung ho about the sector,
FlashNews:
India’s Infrastructure Investments to Surge 50% Despite Global Uncertainties: Crisil Ratings
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate India’s Smart Meter Rollout
Delhi Airport Unveils Multi‑Lingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ₹90 Billion Growth for FY2026‑27
Star Air Launches 70 Weekly Flights, Introduces First‑Ever Direct Mundra-Delhi NCR Route
India’s Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
“RVNL Delivers 17,000 km Rail Projects, Executes ₹2 Trillion Infrastructure:” Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puri’s Doha Visit
IRB Group Reports ₹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for Punatsangchhu‑II, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer India’s First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lal’s 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
Ministry pitches for e-tendering
The Ministry of Road Transport and Highways has asked NHAI and states to striÂctly adopt e-tendering system for better transparency in highways projects, saying it is not being properly implemented.
More premium bids for NHAI
All 4 bids opened on negative VGF exceeding estimation by far. NHAI opened four National Highway bids (on BOT) over the past two working days--three on Friday, 18 November and one on Monday, 21 November. The four have all been on premium, also called negative Viability Gap Funding (VGF) of varying amounts.
Government approves four expressways
The government has apprÂoved building over 1,000 km of expressways under NHDP, entailing an investment of Rs 16,680 crore. The projects include 400 km long Vadodara-Mumbai, 66 km long Delhi-Meerut,
GVK arm bags highway project in MP
GVK Power and Infrastructure Ltd has announced that GVK Transportation Pvt Ltd, a wholly owned subsidiary, has been chosen through an international competitive bidding process to take up the four-laning of Shivpuri-Dewas section of National Highway No 3 in Madhya Pradesh.
NH 56 development
The Cabinet Committee on Infrastructure (CCI) has approved the implementation of the project of four laning of Lucknow-Sultanpur section from 11.5 km to 134.7 km on NH 56 in Uttar Pradesh under NHDP Phase IV A to be executed in BOT mode on DBFOT basis.
The fact that bidders believe in good growth over a period of 20-30 years is a vote of confidence
The net present value of the bids NHAI has received this FY from NVGF from 12 projects on DBFOT is to the tune of Rs 16,500 crore. JN Singh, Member (Finance), NHAI, explains to Shashidhar Nanjundaiah why this limited revenue stream will go a long way in all-round road development.
NHAI has shifted 100% risk to developer: Experts
With shift from the erstwhile revenue-sharing model to fixed premium model under NVGF, NHAI has managed to reduce its own risk. Four of the best road sector experts explain how NVGF works and why it reflects increased competition.
Negative VGF: A new angle in confidence?
Roads Minister CP Joshi recently remarked that the success of NVGF bids reaffirms the confidence of developers in the efforts taken by the government in the highways sector, and that investors see prospects in the road sector.
Achieving growth of road length: A wishlist
A recent post by National Highways Authority of India (NHAI) in its newly created Facebook wall reads "The road to success is always under construction". For most of the industry watchdogs,

