The new open access will encourage private players to enter the power generation segment, The Electricity Act 2003 (EA) had given a five-year notice in 2004 to stakeholders for impleÂmenting open access (OA).
FlashNews:
GREW Solar Unveils G12R Modules for Large-Scale Solar Projects
Inox Solar-LONGi Sign 5 GW Module Deal to Accelerate India’s Solar Manufacturing Push
India Crosses 500 GW Power Capacity; Renewable Generation Tops 50% on Record Day
IMW 2025: Strategic Fleet Ownership Key to India’s Energy Future
POWERGRID, NEA Ink Cross-Border Transmission Pact to Strengthen India-Nepal Power Ties
Rahul Jain Appointed as Suzlon CFO as RE Major Seeks to Expand Footprint
Gadkari Calls for Accountability and Innovation to Build World-Class Roads
India’s Solar Diplomacy Gains Momentum as Minister Joshi Calls for Equitable Energy Transition at ISA Plenary
Solar for All: President Murmu Urges Inclusive Energy Revolution at ISA Plenary
From Code to Concrete: Why the Smart Infrastructure Boom Needs Bobs to Become Tech Builders
Toll Revenues Surge to ₹491.9 Billion in Jan-Sept 2025, Driven by Higher Traffic and Revised User Fees: ICRA Analytics
IMW 2025: India positions itself as maritime bridge between Indo-Pacific and Global South, says Amit Shah
IMW 2025: Gadkari Calls for Private Innovation in Ship Financing, Launches Maritime Vision Report
IndiGo Reconnects with China, Crosses Long-Haul Milestone with Non-Stop London Service
India to Host Asia-Pacific Aircraft Accident Investigation Meet for the First Time
Nithia Capital Acquires Topworth Urja for ₹3 Billion, Expands Long Steel Portfolio
Delhi Airport Reopens Future-Ready Terminal 2 to Boost Passenger Flow and Airline Efficiency
ICRA Forecasts Steady Power Demand Growth in FY2026 Amid Monsoon Drag and Renewable Surge
IndiGo Retains Dominance in Indian Skies as Four New Airports Join Winter Schedule 2025
Tag: Power MInistry
Given our policies, we are lucky to get investors in India
Problems exist at both policy and execution levels in infrastructure sectors, making the country a high-risk investment destination as policymakers have lost out on India’s big advantage as an investment destination, Nasser Munjee, Chairman, Development Credit Bank Ltd
Tata Power to run Mundra UMPP at low capacity
Tata Power Company is preparing contingency plans to minimise loss from running the plant as the cost of imported coal from Indonesia has risen sharply. The company plans to run the 4,000-MW Mundra unit at low capacity, at around 72-78 percent, and is considering blending the fuel with cheÂaper coal of low calorific value to reduce cost of generation.
Power Min demands gas for 8 projects
Towards meeting the production of 3,153.5 MW of electricity, through gas, in the 11th Plan period, the Power Ministry has asked the Petroleum Ministry to expressly consider allocating 16.23 million metric standard cubic metre per day (mmscmd) of gas.
- 1
- 2

