Rays Power Experts has acquired a turnkey order of a 45 MW solar EPC project.
FlashNews:
India’s Ports Surge in Efficiency, Investment: Union Minister Sonowal
Air India Completes DGCA-Mandated Fuel Switch Inspections on Boeing Fleet
Genesys First in India to Link DIGIPIN with 2D and 3D Maps for Digital Address Infrastructure
India’s Rajya Sabha Passes Bills of Lading, 2025: A Landmark Maritime Reform
Rail Car Inspections Begin on Vaitarna-Kharbo Stretch; Western DFC Nears Completion
DEL Vibes: Immersive Cultural Showcase Launched at Delhi International Airport
CS TECH Ai Named PMC for ₹58.1 Million Sewage Revamp in Nashik
India’s ₹35 Trillion Energy Push Hinges on States, Says Puri at Urja Varta
Lending Versatility to Modern Infrastructure with Coated Steel
India Post to Grow Revenue by 30% in FY26 under Scindia’s Vision for Performance-Driven Public Service
Solar Now Far Cheaper Than Conventional Energy as Tariffs Fall: Joshi
India Surpasses Clean Energy Goal with 50% of Grid Now Powered by Non-Fossil Sources
Mumbai-Ahmedabad Bullet Train to Launch with Japan’s Next-Gen Shinkansen Technology
From Trade to Tourism, Sonowal Envisions a New Global Role for BIMSTEC
Railways to Begin Massive CCTV Rollout Across Trains to Boost Onboard Security
Ceinsys Tech Wins ₹1.15 Billion MMRDA Contract for Real-Time Infrastructure Monitoring Platform
Siemens Secures ₹7.73 Billion Contract for Nagpur Metro’s Advanced Signalling and Telecom Systems
DFCCIL Launches India’s First Private Gati Shakti Cargo Terminal on Western Freight Corridor
India Clears Elon Musk’s Starlink for Satellite Internet Rollout
BHEL bags solar project order
BHEL has bagged an order worth Rs 68 crore for setting up a solar power plant in Karnataka. The contract, received from Karnataka Power Corporation Ltd, is for setting up a 10 MW grid-connected solar power plant at Belakavadi village in Mandya
Power Management | Power, the key to economic stability
There is one pivotal era in history that forever changed the way we look at productivity. At the dawn of the industrial revolution, productive output was fundamentally constrained by the limits of human toil or animal strength and by the boundaries of available land.
Vikram Solar commissions mini grid
Vikram Solar has commissioned a 100 KW solar mini grid system at Bahal, Haryana. The mini-grid will help power six residential blocks consisting of 35 households in the village. These households have been connected at load end with auto changeover
Govt to set up separate grid for solar, wind projects
Planning Commission member BK Chaturvedi has said that the Union government would set up a green corridor to generate power from solar and wind capacities that were established at a cost of Rs 50,000 crore, Planning Commission member BK Chaturvedi. The National Action Plan on Climate Change has recommended that India generate 10 per cent of its power needs from solar, wind, hydropower and other renewable sources by 2015, and an additional 5 per cent by 2020.
TN govt’s solar project yet to take off as clarity eludes
Lack of clarity on the implementation of incentives provided by the Tamil Nadu government affected the installation of rooftop solar power systems in households and industrial and commercial buildings. While the solar policy mandates industries and commercial entities to procure 6 percent of their power from solar sources, there has been no official com
TECA wants govt to allot land for solar projects in industrial estates
Tamil Nadu Electricity Consumers Association (TECA), Coimbatore requested the state government to allot land in each of the proposed industrial estates for solar power generation. It may be noted that the state government proposed to set up new industrial estates in the southern districts. D Balasundharam, President of TECA pointed out that these industrial estates would have electrical sub-stati
GMR Infra restructures energy vertical
GMR Infrastructure has reportedly restructured its energy business, which posted a net loss of 160 crore during Oct-Dec 2012 against a net loss of 84.3 crore a year ago, largely owing to fuel constraints. Until some time ago, there were no separate units for this segment, but now the company created several verticals so that complete responsibilities are on the head of th
Case Study: Towards 25 years of carbon-free power
Lanco Solar recently integrated its 5 MW operating solar PV plant, out of 35 MW to be commissioned by end of 2011, to the grid in Gujarat. V Saibaba describes why this project fits into our landmark category
Case Study: Niagara Tunnel breaks barriers
In an ambitious project, an engineering landmark takes shape 140 m under the Niagara Falls in Canada. When finished, the project will increase output by about 1.6 billion kWh, enough to supply renewable energy to 160,000 homes.