Ashish Mithani, Chief Executive Officer and Whole-time Director, KP Energy believes that if the pace of the bids is well-maintained as publicly promised by the government, then in 2020, there would be a continuous addition of 6 GW to 9 GW of wind projects every year.
FlashNews:
India’s Renewables Pivot: From Speed to System Strength
IndiGo Expands Saudi Connectivity with Daily Mumbai-Madinah Flights from November 15
Vaishnaw Visits Delhi Station as Railways Set to Run Record 12,011 Festive Trains
UDAN Turns Nine: 15.6 Million Flyers, ₹90 Billion Invested in Regional Aviation
India’s Logistics Cost to Hit Single Digits by December 2025: Gadkari
Toshiba Commits ₹32.32 Billion to Expand T&D Manufacturing in Japan and India
Embraer-Mahindra Alliance to Deliver C-390 Millennium Transport Aircraft for IAF
Inland Waterway Haldia Multi-Modal Terminal Operationalised Under PPP Model
Digital Monitoring Led to Shutdown of 51 Stalled Projects in Northeast: Scindia
IndiGo Confirms 60 A350-900s, Signs Rolls-Royce Deal to Power Long-Haul Expansion
IndiGo to Launch Direct Athens Flights on India’s First Airbus A321XLR
DGCA Launches Auto-Generated Computer Numbers for Flight Crew via Pariksha Portal
India’s Digital Firewall Shields Millions from Spoof Calls, with Even Google Adopting It: Scindia
India Post Preps to Reboot as Logistics Giant Under Scindia’s Watch
India’s Grade A Warehousing Demand Hits Record 26.5 Million Sq Ft in 2025
IndiGo Integrates with Digi Yatra for Seamless, Contactless Boarding
CS TECH Ai Powers Khanij Online 2.0 Rollout for Transparent Mineral Governance in Chhattisgarh
IREE 2025: Schaeffler India Showcases Future-Ready Rail Solutions at IREE 2025
IREE 2025: Vaishnaw Unveils Bold 7,000-km High-Speed Rail Vision to Power Viksit Bharat
Tag: turbines
Two mega hydropower plants in Himachal shut
Due to a rise in the level of the silt content in the Satluj River, IndiaÂ’s two mega hydropower plants- 1,500 MW Nathpa Jhakri plant and 412 MW Rampur Hydro Electric Project- in Himachal Pradesh were shut down temporarily.
Gamesa wins 100-MW wind power project from Hero Group
Renewable energy firm Gamesa has bagged a 100-MW wind power project from Hero Group to set up 50 wind turbines in Madhya Pradesh. The order was placed by Hero Future Energies, a venture of the Hero Group catering to the renewable energy, Gamesa India said in a statement.
GE proposes to invest Rs.3,000 crore in Maharashtra
US-based General Electric (GE) has proposed to invest Rs 3,000 crore in Maharashtra during a meeting with State Chief Minister Devendra Fadnavis at the World Economic Forum meet in Davos
Gamesa in pact with greenko
For supply of turbines, renewable energy company Greenko has signed up with Spanish wind turbine company Gamesa.
REpower bags contract
Suzlon's unit REpower Systems has signed contracts with ABO Wind for the supply of 13 wind turbines.
RPower's Samalkot project
The 2,400 MW gas-based Samalkot power project of Reliance Power is gathering steam with all six turbines from US based GE arriving in India.