The elevated road was conceptualized as there was no direct access to the International Airport. Now, this very soon-to-be-completed Sahar Elevated Road will facilitate easier and quicker access to the travelers proceeding to and from the Chhatrapati Shivaji International Airport (CSIA). This elevated road provides direct connectivity between the Western Express Highway and Terminal-2 of CSIA to be commissioned shortly.
FlashNews:
Hindalco to be a force for good with engineered solutions transformation: Kumarmangalam Birla
HSR Needs Fast Tracking
RECPDCL Handovers Ratle Kiru Power Transmission Limited, a SPV of Transmission Project, to IndiGrid 2 Private Limited
RECPDCL Handovers 3 Nos. SPVs of transmission projects viz. Banaskantha Transco Limited, Kurnool-IV Transmission Limited & Rajasthan V Power Transmission Limited to Power Grid Corporation of India Limited
Showcasing India’s Supply Chain Revolution
Highlighting the Future of Smart, Sustainable Infra
Driving Sustainability Through Innovation
REC Signs ₹18,360 Cr MoU with Govt. of Kerala for Pump Storage Projects
IIFCL Launches its Gender Equality and Social Inclusion (GESI) Cell on the occasion of International Women’s Day 2025.
IIFCL and CBI Sign Expression of Interest to promote Sustainable Infrastructure Financing in India
CCI India presents 1st edition of CEO Round Table Conference on Agriculture
Jayesh Ranjan & Cement Expo Forum Leaders converge in Hyderabad
Fluence Launches Advanced Smartstack Platform for New Energy Storage Era
NBCC inks MoU with NIT Kurukshetra valuing Rs. 300 Crore
REC Foundation Commits ₹6 Crore to Sankara Eye Hospital for Cataract Surgeries Benefiting 8,000 EWS Patients
Integrated Exhibition Cum Convention Centre (IECC), better known as Bharat Mandapam, achieves prestigious GRIHA 4-Star Rating
REC Limited Signs Agreement with CVPPL, to provide ₹2147.508 Crore Term Loan to Develop 1000MW Pakal Dul Hydro Electric Project
NBCC Reports Robust 40% Surge in Net Profit
The time to invest in India’s energy sector is now, says PM Modi
Tag: Western Express Highway
Work on Mumbai’s Kherwadi flyover to take 18 months
In Mumbai, construction work on the much needed Kherwadi flyover on Western Express Highway (WEH) is all set to begin, the Mumbai Metropolitan Region Development Authority (MMRDA) has announced. The construction on the flyover is to take at least 18 months.
Mumbai’s Milan rail over-bridge to open shortly
In Mumbai, with the much-delayed Milan rail over-bridge set to open by next week, commuters in the western suburbs can have a smooth commuting. Mumbaikars wishing to cross over from SV Road to the Western Express Highway had to earlier use Milan subway — a notorious flooding spot prone to congestion.
Mumbai’s Jogeshwari-Vikhroli Link Road left uncared for
Road users in Mumbai's Jogeshwari-Vikhroli Link Road, which meets the Western Express highway, complain of pathetic state of the roads. Commuters who regularly takes this road to reach their Goregaon office wonder aloud whether this is the kind of infrastructure deserved by a metropolis which pays huge taxes.
Airport Express shut down despite best technologies available
Delhi Metro Airport line’s recent and ongoing shutdown has raised several questions on whether the right technology and equipment is being used in our rail and metro rail systems.