The elevated road was conceptualized as there was no direct access to the International Airport. Now, this very soon-to-be-completed Sahar Elevated Road will facilitate easier and quicker access to the travelers proceeding to and from the Chhatrapati Shivaji International Airport (CSIA). This elevated road provides direct connectivity between the Western Express Highway and Terminal-2 of CSIA to be commissioned shortly.
FlashNews:
Inox Clean Energy, RJ Corp Enter Africa’s IPP Market, Target 2.5 GW by FY2029
Best Pills for Erection: Myths, Facts, and Smart Choices
Best Pills for Erection: Audience‑Specific Guidance with Safety Disclaimers
DIAL Launches Family@DEL: First Family‑Centric Travel Initiative at an Indian Airport
India’s SDHI Lands Landmark Oman Defence Ship Deal
Air India Unveils First Line‑Fit Boeing 787‑9, Signals Bold Global Transformation in 2026
Vizhinjam Expansion Strengthens India’s Maritime Competitiveness: Sonowal
Tata Power Odisha Discoms Secure Top National Rankings for Third Consecutive Year
SDHI Secures $227 Million Chemical Tanker Deal, Revives India’s Commercial Shipbuilding
India’s Energy Transition Sets Global Pace: Pralhad Joshi at Davos
IWDC Clears ₹15 Billion Projects to Boost Green Mobility, Cargo and River Tourism
World Bank Approves $815 Million Financing for Tata Power-DGPC Dorjilung Hydropower Project in Bhutan
Indian Railways Deploys Humanoid Robot ASC ARJUN at Visakhapatnam for Smart Station Security
India’s Power Grid Crosses 500,000 Circuit Km, Marks 71.6% Growth Since 2014
India Inc Optimistic on Growth, Flags Infrastructure, Defence and Export Priorities: FICCI Survey
NHAI, Konkan Railway Ink MoU to Boost Integrated Road‑Rail Infrastructure Development
DGCA Digitises Pilot Licensing with Electronic ATPL Services to Strengthen Aviation Ecosystem
Power Minister Calls for Financially Strong Discoms to Drive India’s Energy Future
BLR Airport Launches Gate Z, India’s First Social Lounge Redefining the Airport Experience
Tag: Western Express Highway
Work on Mumbai’s Kherwadi flyover to take 18 months
In Mumbai, construction work on the much needed Kherwadi flyover on Western Express Highway (WEH) is all set to begin, the Mumbai Metropolitan Region Development Authority (MMRDA) has announced. The construction on the flyover is to take at least 18 months.
Mumbai’s Milan rail over-bridge to open shortly
In Mumbai, with the much-delayed Milan rail over-bridge set to open by next week, commuters in the western suburbs can have a smooth commuting. Mumbaikars wishing to cross over from SV Road to the Western Express Highway had to earlier use Milan subway — a notorious flooding spot prone to congestion.
Mumbai’s Jogeshwari-Vikhroli Link Road left uncared for
Road users in Mumbai's Jogeshwari-Vikhroli Link Road, which meets the Western Express highway, complain of pathetic state of the roads. Commuters who regularly takes this road to reach their Goregaon office wonder aloud whether this is the kind of infrastructure deserved by a metropolis which pays huge taxes.
Airport Express shut down despite best technologies available
Delhi Metro Airport line’s recent and ongoing shutdown has raised several questions on whether the right technology and equipment is being used in our rail and metro rail systems.


