Petroleum Oil and Lubricant (POL) berth no. 13 was recently commissioned at New Mangalore Port to cater to the additional demand of the potential users. This berth has the cargo handling capacity to the tune of 7.8 MTPA. The construction of this berth had cost Rs 79.17 crore. In addition to this, the foundation stone for berth no. 18 was recently laid at the New Mangalore Port. The berth length will be 325m and 25m width and would handle bulk cargo and containers. The berth is designed for 1.25 lakh DWT vessels with a maximum LOA of 280m, beam 42m and depth of 15.1m. Rotterdam Maritime Group and Tata Consultancy Services had conducted traffic study for this project.
FlashNews:
Windergy India 2025: India Must Target 85% Local Content in Wind Projects by 2030, Says MNRE Minister
THINK Gas and Tata Motors Join Forces to Expand LNG Trucking Infrastructure
Otis India to Equip Mumbai-Ahmedabad Bullet Train Stations with 55 Elevators and Escalators
Alpex Solar to Commission 2.2 GW G12R TOPCon Cell Facility in Strategic Technology Pivot
IndiGo Adds Bengaluru-Riyadh Direct Flights to Expand Middle East Connectivity
Honeywell Unveils Biocrude Technology to Power Maritime and Aviation Decarbonisation
GREW Solar Unveils G12R Modules for Large-Scale Solar Projects
Inox Solar-LONGi Sign 5 GW Module Deal to Accelerate India’s Solar Manufacturing Push
India Crosses 500 GW Power Capacity; Renewable Generation Tops 50% on Record Day
IMW 2025: Strategic Fleet Ownership Key to India’s Energy Future
POWERGRID, NEA Ink Cross-Border Transmission Pact to Strengthen India-Nepal Power Ties
Rahul Jain Appointed as Suzlon CFO as RE Major Seeks to Expand Footprint
Gadkari Calls for Accountability and Innovation to Build World-Class Roads
India’s Solar Diplomacy Gains Momentum as Minister Joshi Calls for Equitable Energy Transition at ISA Plenary
Solar for All: President Murmu Urges Inclusive Energy Revolution at ISA Plenary
From Code to Concrete: Why the Smart Infrastructure Boom Needs Bobs to Become Tech Builders
Toll Revenues Surge to ₹491.9 Billion in Jan-Sept 2025, Driven by Higher Traffic and Revised User Fees: ICRA Analytics
IMW 2025: India positions itself as maritime bridge between Indo-Pacific and Global South, says Amit Shah
IMW 2025: Gadkari Calls for Private Innovation in Ship Financing, Launches Maritime Vision Report
Home » Berth No. 18 under construction at New Mangalore Port
Berth No. 18 under construction at New Mangalore Port
Oil & Gas
January 2, 2014January 2, 2014

 

Leave a Reply
You must be logged in to post a comment.