In any project, constructing on weak sub-grade is always a challenge. In this case, StrataWeb’s client, Allcargo Logistics, faced with a similar situation at their proposed container terminal in Kolkata. The container yard, located at Kidderpore Dock is being utlised for transit storage of heavy containers, which would be stacked five-high. The subsoil in this area includes 7-8 metres of riverine deposits comprising of soft clay topped by about 3 metres of heterogeneous fill. <br />
<br />
Strata Geosystems is a leader in the geosynthetics market across the globe. <br />
The company provides end-to-end solutions for soil reinforcement challenges including the supply, design, and construction with our world renowned StrataGrid™ (geogrid) and StrataWeb®(geocells). In addition to the ISO and CE mark, the testing for our products are conducted in GAI-LAP accredited labs across the U.S., U.K., and India. We are also a proud member of the International Geotechnical Society (IGS) promoting advancements in geosynthetics.<br />
<br />
<span style="font-weight: bold;">The Challenge</span><br />
Container yards typically have two major issues: <br />
– Heavy pressures from container stacks<br />
– Non-uniform settlements of the ground<br />
<br />
<span style="font-weight: bold;">The Conventional Approach</span><br />
By the conventional method, the subsoil is consolidated by installing prefabricated vertical drains (PVDs) and preloaded by placing surcharge. This is a slow process which requires close monitoring of settlements as the surcharge is placed in stages. Surcharging usually involves large quantity of earthwork to progressively achieve the final load, often equivalent to the load to be transferred from the loading system. However, a container stack loads are quite heavy, requiring heavy surcharge. Besides, time to retain each surcharging stage to develop adequate bearing capacity for the next stage required to be carefully determined by monitoring settlement trends during each loading stages. The cost of earthworks to achieve the final loading and its redundancy after surcharging can be overwhelming. <br />
<br />
<span style="font-weight: bold;">Strata’s Innovative Approach</span><br />
Strata geotechnical specialists designed an innovative solution that is cost-effective, technically-sound, and long-lasting. The Strata solution eliminates the concrete layer altogether. The system incorporates StrataWeb within the paving to reduce the bearing pressures onto the subsoil. This provides a leaner pavement design. StrataWeb along with infilling also addresses the differential settlement issues, providing an even working ground.<br />
<br />
The above analysis demonstrated that imposed pressures with a section reinforced with StrataWeb®SW 356-150 (Weld spacing 356 mm; cell depth 150mm) are well within the safe bearing capacity of the sub-grade. The design included two layers of StrataWeb to bear the load spread. The StrataWeb was in-filled and topped with 10 mm of down-graded gravel. StrataBase was included to further strengthen the section and improve the performance.<br />
<br />
<span style="font-weight: bold;">Strata’s value addition </span><br />
<ul>
<li>Saved up to 15 per cent of the cost compared to conventional methods.</li>
<li>Rapid installation due to ease of StrataWeb transportation and use of locally available and cheaper material.</li>
<li>Increased life span with lower maintenance.</li>
<li>Load spread ensured that bearing pressures were within safe limits.</li>
<li>Uniform settlements and even working ground.</li></ul>
FlashNews:
India Clears ₹100 Billion ATF Stabilisation Package Amid West Asia Crisis
Chasing 70 GW Ambition, Suzlon 2.0 Re‑invents Wind for Energy Transition
Digi Yatra Crosses 100 Million Journeys, Expands Seamless Travel Across 38 Airports
AM/NS India Wins First PM‑SETU Approval, as Andhra Pradesh Leads ITI Transformation
NHAI Finalises Highway Monetisation Plan for FY2026‑27
Sonowal Launches Port Performance Index, Digital Maritime Reforms to Boost Competitiveness
MGL and Fourth Partner Energy Ink MoU for Clean Energy Push
IGIA Deploys SKYCAST, India’s First Next‑Gen All‑Weather Station to Boost Aviation Safety
REC Signs MoU with ERDA to Strengthen Quality Assurance under RDSS
SEIL Energy India Hosts South India’s First C&I Conference
AM/NS India Sets Global Benchmark with Ultra‑High Strength Welded Pipes
CleanMax Raises $575 Million for 1 GW Renewable Push in Rajasthan and Karnataka
ADR Adopted at BRICS Meet, Meghwal Pedals for Sustainability
The New Power Corridor
Mumbai’s Rooftop Solar Revolution: Tata Power Consumers Slash Bills by 50%
GAIL Posts ₹69.68 Billion Profit for FY2025-26 Amid Global Headwinds
RRP Defense Secures ₹298 Million BEL Order for Germanium Lenses
Noida International Airport: India’s New Visiting Card
India, Korea Ink Landmark MoU for Thoothukudi Mega Greenfield Shipyard
Home » Construction of container storage yard with StrataWeb
Construction of container storage yard with StrataWeb
Warehousing & Logistics
March 31, 2018March 31, 2018


Leave a Reply
You must be logged in to post a comment.