Punjab and Jammu and Kashmir have signed an agreement on the Shahpur Kandi project, where 207 MW power be generated and irrigate 95,000 acre of land for the farmers. The project will also provide a balancing reservoir to enable the upstream Ranjit Sagar dam project. Of the 600 MW installed capacity of the Ranjit Sagar Dam, only 300 MW is generated at a maximum output as the Upper Bari Doab Canal (UBDC) system cannot handle more flow. Also, the water would go waste to Pakistan if the generation is sought to be ubbed. However, with the construction of the Shahpur Kandi dam, a gross storage capacity of 12,071 hectare metre would be provided so it would generate 600 MW at the Ranjit Sagar dam without letting any water downstream of Shahpur Kandi. This water would then be utilised for the fields in Punjab and Jammu and Kashmir through UBDC system and the J&K canal from the Madhopur Headworks in Pathankot.
FlashNews:
Lending Versatility to Modern Infrastructure with Coated Steel
India Post to Grow Revenue by 30% in FY26 under Scindia’s Vision for Performance-Driven Public Service
Solar Now Far Cheaper Than Conventional Energy as Tariffs Fall: Joshi
India Surpasses Clean Energy Goal with 50% of Grid Now Powered by Non-Fossil Sources
Mumbai-Ahmedabad Bullet Train to Launch with Japan’s Next-Gen Shinkansen Technology
From Trade to Tourism, Sonowal Envisions a New Global Role for BIMSTEC
Railways to Begin Massive CCTV Rollout Across Trains to Boost Onboard Security
Ceinsys Tech Wins ₹1.15 Billion MMRDA Contract for Real-Time Infrastructure Monitoring Platform
Siemens Secures ₹7.73 Billion Contract for Nagpur Metro’s Advanced Signalling and Telecom Systems
DFCCIL Launches India’s First Private Gati Shakti Cargo Terminal on Western Freight Corridor
India Clears Elon Musk’s Starlink for Satellite Internet Rollout
GAIL, OIL Extend 15-Year Gas Supply Pact for Rajasthan Fields
Invest in IREDA Bonds to Support India’s Green Energy Transition and Save Tax
India Invites Feedback on Oil & Gas Reforms Ahead of Landmark OALP Round X: Hardeep Singh Puri
₹50 Billion Boost for Northeast Waterways; Kaladan Project to be Operational by 2027: Sonowal
Tata Sons’ Chandrasekaran Outlines Energy Transition Runway Amid Group’s Moment of Reflection
CII President Rajiv Memani Offers Blueprint for a Competitive Viksit Bharat
JSW Paints to Acquire Majority Stake in Akzo Nobel India in ₹89.86 Billion Deal
India to Extend Digitalisation of Public Services to the Power Sector with India Energy Stack
Home » Punjab-J&K dam agreement promises win-win
Punjab-J&K dam agreement promises win-win
Water & Waste
October 25, 2018June 9, 2021

Leave a Reply
You must be logged in to post a comment.