Category: Railways & Metro Rail

Post
Mumbai’s 3 central railway stations to get ROBs

Mumbai’s 3 central railway stations to get ROBs

The Brihanmumbai Municipal Corporation (BMC) got the green light from the Railways to build road overbridges (ROBs) at three central railway stations in Mumbai. This will help streamline traffic flow in the busy pockets of the suburbs. An officer of the BMC's Bridges Department said on June 28 that the railways has said that it would cooperate with the BMC to construct three bridges at Vidyavihar, Vikhroli and Nahur railway stations.

Post
UP cabinet clears phase I of metro rail project

UP cabinet clears phase I of metro rail project

At a cabinet meeting presided by Chief Minister Akhilesh Yadav, the Uttar Pradesh government decided to begin work on the first phase of the Lucknow metro rail project on North-South corridor. The project would be implemented on the lines of Delhi Metro Rail Corporation (DMRC). The state government formed the Lucknow Metro Rail Corporation (LMRC) to oversee the construction work and finali

Post
High Court clears land acquisition for metro project

High Court clears land acquisition for metro project

The transport department of the West Bengal government received clearance from the Calcutta High Court for the land acquired to implement a part of the East-West Metro project. The department acquired land for construction of Central Station at Bowbazar in the city under the metro rail project. However, residents of the area opposed the land acquisition arguing that the state government failed to anno

Post
Koderma-Giridih railway track opened in Jharkhand

Koderma-Giridih railway track opened in Jharkhand

Jharkhand Chief Minister BabulalMarandi on June 25 flagged off the first passenger train between Koderma and Nawadih on Koderma-Nawadih-Giridih railway track under Dhanbad division. The railway network - the foundation stone for which was laid by former prime minister Atal Bihari Vajpayee in 2005 - will help people of Koderma, Domchanch, Markacho, Maheshpu and Nawadih. The Rs 371.36-crore Koderma-Giridih track project, covering 111 km, was sanctioned and supposed to be commissioned by 2005-06.

Post
Study cites disaster risks in Delhi metro rail system

Study cites disaster risks in Delhi metro rail system

A report by the United Nations office on disaster risk reduction, UNISDR, points out that over 50 stations (phases I & II) of the Delhi Metro are located in areas of high-earthquake hazard, exposing the line to earthquakes of up to a magnitude of 8 on the Richter scale. UNISDR said this in its Global Assessment Report (GAR), which was released on June 3 for the Asia-Pacific region. One of the stations was also built in a high-flood hazard area. In both cases, hazard information was avail

Post
Railways carry 171 mn t traffic in 2 months

Railways carry 171 mn t traffic in 2 months

During April-May 2013, Indian Railways carried 171.91 million tonne of revenue earning freight traffic . The freight carried shows an increase of 7.53 million tonne over the freight traffic of 164.38 million tonne actually carried during the corresponding period last year, registering an increase of 4.58 per cent. During the month of May 2013, the revenue earning freight traffic carried by Indian Railways was 88.19 million tonn

Post
RITES to prepare reports for metro rail project

RITES to prepare reports for metro rail project

State-run consultancy firm RITES will submit the feasibility report for the proposed 30-km Patna Metro rail project by September, 2013 and the detailed project report (DPR) by December, 2013. In its scope of works, the consultant will be required to identity the mass transit corridors on the basis of detailed traffic demand assessment study, topographic survey, soil survey at 500 meters interval on the proposed stretch among other measures, they