Coal production increased from 556.4 MnT in 2012-13 to 610.8 MnT during 2014-15, Piyush Goyal, Minister of State (IC) for Power, Coal & New and Renewable Energy, said. The Minister stated that as per the coal ministry´s annual plan document of 2015-16, the annual target for overall coal production for 2015-16 is fixed at 700 MnT. An action plan has also been drawn up to achieve production of the stated target of 1,000 MnT by 2019-20. As on April 1, 2015, a total of 81,049 MnT of geological resources of coal reserves had been estimated in Jharkhand by the Geological Survey of India. The Minister said in order to increase production in Jharkhand, the focus is to facilitate environment and forest clearances, assist with land acquisition and coordinate with the Railways for moving coal.
FlashNews:
India’s Rajya Sabha Passes Bills of Lading, 2025: A Landmark Maritime Reform
Rail Car Inspections Begin on Vaitarna-Kharbo Stretch; Western DFC Nears Completion
DEL Vibes: Immersive Cultural Showcase Launched at Delhi International Airport
CS TECH Ai Named PMC for ₹58.1 Million Sewage Revamp in Nashik
India’s ₹35 Trillion Energy Push Hinges on States, Says Puri at Urja Varta
Lending Versatility to Modern Infrastructure with Coated Steel
India Post to Grow Revenue by 30% in FY26 under Scindia’s Vision for Performance-Driven Public Service
Solar Now Far Cheaper Than Conventional Energy as Tariffs Fall: Joshi
India Surpasses Clean Energy Goal with 50% of Grid Now Powered by Non-Fossil Sources
Mumbai-Ahmedabad Bullet Train to Launch with Japan’s Next-Gen Shinkansen Technology
From Trade to Tourism, Sonowal Envisions a New Global Role for BIMSTEC
Railways to Begin Massive CCTV Rollout Across Trains to Boost Onboard Security
Ceinsys Tech Wins ₹1.15 Billion MMRDA Contract for Real-Time Infrastructure Monitoring Platform
Siemens Secures ₹7.73 Billion Contract for Nagpur Metro’s Advanced Signalling and Telecom Systems
DFCCIL Launches India’s First Private Gati Shakti Cargo Terminal on Western Freight Corridor
India Clears Elon Musk’s Starlink for Satellite Internet Rollout
GAIL, OIL Extend 15-Year Gas Supply Pact for Rajasthan Fields
Invest in IREDA Bonds to Support India’s Green Energy Transition and Save Tax
India Invites Feedback on Oil & Gas Reforms Ahead of Landmark OALP Round X: Hardeep Singh Puri
Home » Coal production up in 2014-15: Goyal
Coal production up in 2014-15: Goyal
Coal & Mining
September 1, 2015September 1, 2015

Leave a Reply
You must be logged in to post a comment.