Solar Energy Corporation of India (SECI) conducted IndiaÂ’s first auction of wind power projects in February 2017 of Rs 3.46 tariff in accordance to the governmentÂ’s plan of 175 GW RE within 2022. The bid was of 1,000 MW for projects to be connected on Inter State Transmission System (ISTS). Mytrah, Inox, Ostro, Green Infa and Adani were the winners of the bid. SECI has brought out five tenders for wind power projects of cumulative capacity of 7,250 MW, of which 6,050 MW capacity has been awarded.
FlashNews:
Indian Railways Launches Assured Transit Container Service from Delhi to Kolkata
IGL Opens New Delhi Office as Minister Puri Highlights India’s Clean Energy Push and Refining Ambitions
Road Construction May Hit Five-Year Low in FY2026, Cautions ICRA
Delhi Airport Rolls Out E-Arrival Card for Foreign Travellers to Streamline Immigration
From Muddy Tracks to Expressways: Bihar’s Quiet Road Revolution
NMIA Secures DGCA Aerodrome Licence Ahead of October Launch
India Re-elected to ICAO Council with Enhanced Global Support
India’s Renewable Energy Surge: ICRA Projects 35 GW Capacity in FY2026
Air Marshal Bharti Calls for Full Indigenisation to Win Future Wars
Air India, Airbus Launch Advanced Pilot Training Hub in Gurugram
India-Bhutan Rail Links Signal Strategic Leap in Himalayan Connectivity
India Anchors $8 Billion Maritime Investment Wave
India’s Deepwater Energy Ambitions Ignite with Andaman Basin Gas Discovery
Mumbai-Ahmedabad bullet train corridor to emerge as major economic cluster: Ashwini Vaishnaw
IndiGo Adds 12 New Domestic Routes in October, Strengthens Regional Air Connectivity Across India
IndiGo Deepens Indian Ocean Connectivity with New Routes to Bali and Malé
Air India Express Adds Jodhpur and Udaipur to Domestic Network, Expands Footprint to 60 Destinations
Noida International Airport Pioneers India’s Green Construction Shift with LC3 Cement
Domestic Flyers Drive Digital Airport Revolution with Record Self-Check-In and DigiYatra Uptake: CSMIA
Home » IndiaÂ’s first ISTS connected wind power project commissioned
IndiaÂ’s first ISTS connected wind power project commissioned
Power & New and Renewable Energy
August 29, 2018June 9, 2021

Leave a Reply
You must be logged in to post a comment.