State-run NHPC has in a filing with BSE said that it has released L&T from performance of the contracts Lot SSL.2 and SSL.5 for building lower Subansiri Hydroelectric Project located on the border of Arunachal Pradesh and Assam, as per the provisions contained in the contract conditions. Located near North Lakhimpur, the Subansiri Hydroelectric Project is the biggest hydroelectric project undertaken in India so far. Estimated cost of the 2,000-MW (8×250 MW) capacity project is Rs 6,285.33 crore (at December 2002 Price Level). It is now expected to be commissioned in December 2018.
FlashNews:
Indian Railways Launches Assured Transit Container Service from Delhi to Kolkata
IGL Opens New Delhi Office as Minister Puri Highlights India’s Clean Energy Push and Refining Ambitions
Road Construction May Hit Five-Year Low in FY2026, Cautions ICRA
Delhi Airport Rolls Out E-Arrival Card for Foreign Travellers to Streamline Immigration
From Muddy Tracks to Expressways: Bihar’s Quiet Road Revolution
NMIA Secures DGCA Aerodrome Licence Ahead of October Launch
India Re-elected to ICAO Council with Enhanced Global Support
India’s Renewable Energy Surge: ICRA Projects 35 GW Capacity in FY2026
Air Marshal Bharti Calls for Full Indigenisation to Win Future Wars
Air India, Airbus Launch Advanced Pilot Training Hub in Gurugram
India-Bhutan Rail Links Signal Strategic Leap in Himalayan Connectivity
India Anchors $8 Billion Maritime Investment Wave
India’s Deepwater Energy Ambitions Ignite with Andaman Basin Gas Discovery
Mumbai-Ahmedabad bullet train corridor to emerge as major economic cluster: Ashwini Vaishnaw
IndiGo Adds 12 New Domestic Routes in October, Strengthens Regional Air Connectivity Across India
IndiGo Deepens Indian Ocean Connectivity with New Routes to Bali and Malé
Air India Express Adds Jodhpur and Udaipur to Domestic Network, Expands Footprint to 60 Destinations
Noida International Airport Pioneers India’s Green Construction Shift with LC3 Cement
Domestic Flyers Drive Digital Airport Revolution with Record Self-Check-In and DigiYatra Uptake: CSMIA
Home » L&T released from Subansiri project contract: NHPC
L&T released from Subansiri project contract: NHPC
Power & New and Renewable Energy
June 1, 2015June 1, 2015

Leave a Reply
You must be logged in to post a comment.