Home » BSES Yamuna Power Limited

Tag: BSES Yamuna Power Limited

Post
Infrascape 2013 | Policy reforms to accelerate capacity building in distribution

Infrascape 2013 | Policy reforms to accelerate capacity building in distribution

When we reflect on the developments in the power sector in 2012, we find that it was a mixed bag. The generation sector saw a phenomenal, unprec­edented, capacity addit­ion thus, bridging the energy gap to a great extent. Today, the total installed generation capa­city is over 209,000 MW after an addition of over 50,000 MW in the 11th 5 year plan period.