This is all about connectivity and a country needs to have infrastructure in roads, railways, energy, power plants and being able to provide the necessary infrastructure that is needed, in the case of India, to achieve a good degree of success with the Make in India campaign.
FlashNews:
Vizhinjam Expansion Strengthens India’s Maritime Competitiveness: Sonowal
Tata Power Odisha Discoms Secure Top National Rankings for Third Consecutive Year
SDHI Secures $227 Million Chemical Tanker Deal, Revives India’s Commercial Shipbuilding
India’s Energy Transition Sets Global Pace: Pralhad Joshi at Davos
IWDC Clears ₹15 Billion Projects to Boost Green Mobility, Cargo and River Tourism
World Bank Approves $815 Million Financing for Tata Power-DGPC Dorjilung Hydropower Project in Bhutan
Indian Railways Deploys Humanoid Robot ASC ARJUN at Visakhapatnam for Smart Station Security
India’s Power Grid Crosses 500,000 Circuit Km, Marks 71.6% Growth Since 2014
India Inc Optimistic on Growth, Flags Infrastructure, Defence and Export Priorities: FICCI Survey
NHAI, Konkan Railway Ink MoU to Boost Integrated Road‑Rail Infrastructure Development
DGCA Digitises Pilot Licensing with Electronic ATPL Services to Strengthen Aviation Ecosystem
Power Minister Calls for Financially Strong Discoms to Drive India’s Energy Future
BLR Airport Launches Gate Z, India’s First Social Lounge Redefining the Airport Experience
MoPNG Highlights Financing Strength, Regulatory Reforms Ahead of New Upstream Bid Rounds
ABB India Modernises BPCL’s Vadinar‑Bina Pipeline for Uninterrupted Operations
Vaishnaw Projects 6-8% Growth, Highlights Reform Momentum at Davos
Aerem Solutions Secures $15 Million to Drive Distributed Solar Adoption Across India
India Showcases Energy Transition at Davos: Joshi Calls for Global Collaboration
Indian Railways Expands High-Speed Track Network, Boosts Safety with Modernisation
Tag: Fukushima
Japan to build up world's largest offshore wind farm
Japan is to build the world's largest offshore wind farm to replace the crippled nuke plant at Fukushima following the 2011 Fukushima nuclear disaster. The country plans to build a total of 143 wind turbines on platforms 16 km off the coast of Fukushima by 2020, which is home to the stricken Daiichi nuÂclear reactor that hit the headlines in March 2011 when it was damaged by a severe earthquake and tsunami.
Kudankulam plant safe, say experts
Nuclear experts said that the Kudankulam Nuclear Power Plant (KKNPP) has built into its design a multi-layered safety mechanism along with additiÂonal protocols to safeguard agaÂinst systemic or human error at the 2,000-MW station.
Nuclear site planning: Site selection is first step in nuke safety
Location of a nuclear power plant is the first step to its safety. Although not a single death has occurred in Fukushima so far because of radiation, questions are raised about why a modern nuclear plant in a high seismic and Tsunami-prone location proved so vulnerable.
Fukushima-Daiichi aftermath
In the aftermath of the tsunami in Japan, the Centre is considering fine-tuning its plans of locating power plants, along the coast.


