For residents of MG Road, DLF Phase II and III in Gurgaon, the Rapid Metro will become a boon. It will also add sheen to the commercial properties in DLF Cyber City. Cushman and Wakefield says that since the start of construction of Rapid Metro in 2010, the residential properties on MG Road, DLF Phase II and III witnessed an appreciation between 35 per cent and over 100 per cent.
FlashNews:
IndiGo, Digi Yatra and BIAL Pioneer India’s First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lal’s 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
Japan’s JFE Engineering Invests ¥750 Million in Antony Waste; First FDI in India’s Waste-to-Energy Sector
SDHI Wins India’s First Ammonia Dual‑Fuel Bulk Carrier Order
SAME and IndiGo Launch Cadet AME Programme to Train India’s Next Aviation Engineers
IndiGo Revises Fuel Charges as ATF Costs Soar
Putting Turbulence Behind IndiGo Appoints Willie Walsh to Drive Future Global Growth
DFCCIL Completes Trial Run on Newly Electrified JNPA-Vaitarna Freight Corridor
Sourav Ganguly, Indian Cricket’s ‘Dada’, Named JAKSON Group’s First Brand Ambassador
RAHSTA Roundtable Sets Agenda for Smarter, Safer Highways
CTS Roundtable Charts Tech-Led Roadmap for Construction
Drone Startup BonV Aero Hails Rangeilunda’s Integrated Drone Testing
India Orders Boost in LPG Output to Safeguard Household Supply
“Entrepreneurial hunger, technology enablement to drive massive growth”
Tata Power Odisha Discoms Empower Women with ‘Nua Arambha’ Careers Initiative
Deepak Gupta Named CMD of GAIL, to Drive Energy Growth
India Is Advancing Growth While Preserving Heritage: Sonowal
Tag: MG Road
Re-carpeting of MG Road in Gurgaon to end in 6 months
The Haryana Public Works Department (PWD) has stated that the re-carpeting and re-construction of MG Road in Gurgaon will be completed within six months. The heavy vehicular traffic on the stretch was delaying the work, PWD authorities said. The work was taken up last month when Gurgaon and Delhi surburbs were witnessing heavy rains.
Blore road work needs multi-agencies’ coordination
In Bangalore, the much-awaited upgrade of roads along the Namma Metro stretch from Anil Kumble Circle on MG Road to Baiyappanahalli could take place very soon. The project cost is estimated at Rs 114 crore. For this, multi-agencies coordinated effort is said to be essential in addition to the Bangalore Metro Rail Corporation (BMRCL). The upgrade involves a complete overhaul of the roads and underground utilities, installation of permanent UG ducts for storm water, electric cables, sewage, OFCs,
DMRC to work on Kochi’s MG Road for metro rail
In Kochi, the Delhi Metro Rail Corporation (DMRC) has finalised plans to begin work on the city's heart line, MG Road, starting next weekend (June 29-30). While work is expected to start in the right earnest only after the Onam festival, the Metro agency will carry out the preparatory work during weekends till September on the stretch.
DMRC has sought the permission to close down the stretch on MG Road between Padma Junction and Abad Plaza hotel on June 29-30 to physically trace utility lines.
Elevated corridor on Gurgaon’s MG Road set to get nod
The Gurgaon Municipal CorporationÂ’s proposed elevated corridor at Maharana Pratap Chowk, MG Road in the city is likely to get government's approval in a weekÂ’s time. The move is expected after a high level meeting in Chandigarh, recently. The MCG had sent a detailed project report (DPR) for the government's approval three months ago that met some objections from the top brass.

