Transporting 1,100 mt stators for a thermal plant in interior India is a challenge because of the magnitude as well as logistical bottlenecks.
FlashNews:
IndiGo to Build Navi Mumbai International Hub with 12 Overseas Routes from February 2027
Akasa Air Launches Daily Vizag-Delhi Flights, Boosting Connectivity to Andhra Pradesh
SMFCL Targets ā¹602 Billion Disbursals by 2031 as Maritime Financing Ecosystem Takes Shape
India Must Build a Complete Maritime Ecosystem to Unlock Shipbuilding Ambitions: TK Ramachandran
Geospatial Workforce Expansion Critical to Viksit Bharat Vision: Experts
Agrivoltaics: States Court Investors as Farm-Solar Adoption Accelerates
Sonowal Urges Polish Firms to Build and Invest in India as Strategic Ties Deepen
Indian Railways Records Highest-Ever Coal Loading Growth in October
Climate Fund responsAbility Investment Fuels Navitasā Solar Manufacturing Expansion
Air India Begins Construction of Advanced MRO Facility at Delhi Airport
TVS ILP Leases 80,000 Sq Ft Visakhapatnam Warehouse to Yokohama Groupās ATC Tires
Viasat Names Six Finalists for Space for Good India Challenge 2026 Finals
India Prepares Mega Agrivoltaics Push as Farmland Solar Potential Surpasses 2050 Power Demand
From Jaipur to Russia: RUSAL Opens New Opportunities for Indian Workers
Sovereign Cloud Emerges as Indiaās AIāReady Digital Foundation
Shivalaya Construction Secures ERESā47 Transmission SPV for Eastern Grid Expansion from RECPDCL
Indiaās Open Mobility Pioneer Takes Its RideāHailing Model to Europe
NTPC, Africa50 Join Forces to Develop Power Projects Across Africa
NHAI Introduces Independent Design Checks for Major Bridges and Critical Highway Structures
RPower wants joint coal mining with NTPC
Jharkhand Integrated PowĆĀer, of Anil AmbaniĆ¢ā¬ā¢s ReliaĆĀnce group, has proposed to join hands with NTPC in mining coal from mines in Jharkhand that have been given to the entities to fuel their upcoming power projects.
Projects without coal linkages
NTPC has been granted environment clearance for setting up three coal-based power plants, even before the source of coal has been determined.
IOC revisits Ennore for LNG and power
Indian Oil Corporation (IOC) will commission a detailed feasibility report (DFR), which will cost Rs 3-4 crore on a 2.5 mt a year liquefied natural gas (LNG) import terminal at Ennore.
4,000 MW project in Vizag
NTPC has plans to set up 4,000 MW power project at Pudimadaka, Anakapalli Mandal in Andhra Pradesh at a cost of Rs 23,000 crore.
NTPC floats tender to source super-critical equipment
NTPC will float tenders worth Rs 17,000 crore this month-end for sourcing super-critical equipment.

