Human Rights Forum (HRF), a voluntary forum of rights activists, has made certain demands on the Ministry of Environment and Forests (MoEF) with regard to the process for issue of environmental clearances to thermal power projects. The Forum has asked for extension of period for filing objections from the present 15-30 days, and a mechanism to scrutinise the Environmental Impact Assessment (EIA) reports before putting them up for public hearing. HRF had pointed out glaring instances of plagiarism in the EIA report for the 4,000-MW Yadadri Thermal Power Project in Nalgonda district submitted by TSGENCO to the Expert Appraisal Committee (EAC) of the MoEF, based on which the committee has deferred the issue of EC for the project.
FlashNews:
FLY91 Strengthens Leadership Team with Seasoned Aviation Executives to Drive Regional Growth
Sonowal Calls for Technology‑Led Maritime Security as India’s Port Network Grows
Civil Aviation Minister Naidu Expands Pilot Training Network with 11 New FTOs
INS Malvan Commissioned with AM/NS India Steel Backbone
Air India Names Tewolde Gebremariam CEO & MD to Drive Global Expansion
PM Surya Ghar: Muft Bijli Yojana Crosses 5 Million Rooftop Solar Installations
Delhi Airport Expands Domestic Network to 90 Destinations with Launch of Direct Flights to Daman
Jupiter Wagons, Lucchini RS to Build India’s First Fully Integrated Private‑Sector Railwheel Manufacturing Platform
Willie Walsh Takes Charge as IndiGo CEO
Indian Railways Posts 9% Freight Growth in July 2026
PM Modi Dedicates POWERGRID Transmission Projects for Clean Energy in Andhra Pradesh
AM/NS India Highlights Long‑Life Solar Infrastructure with Magnelis for 300 GW Ambition
RECPDCL Hands Over Ryapte Transmission SPV to Tata Power
India’s Rooftop Solar Push Accelerates as PM Surya Ghar Nears 5 Million Homes
PM Modi Looks East to Future After Bhogapuram Airport Unveiling
India Approves ₹50.7 Billion Scheme for Floating Solar Projects with Energy Storage
Air India, SkyDrive, and Suzuki Join Forces to Explore eVTOL Medical Logistics in India
REC, PFC Seal ₹268.5 Billion Loan Deal for 2,400 MW Meja Thermal Project
Tata Power Renewables Breaks Ground on 800 MW Hybrid Project in Andhra Pradesh
Home » HRF seeks transparency in environmental clearance to thermal projects
HRF seeks transparency in environmental clearance to thermal projects
Power & New and Renewable Energy
October 1, 2016October 1, 2016


Leave a Reply
You must be logged in to post a comment.