Azure Power, a leading Indian solar power producer, has announced that it has won a 50 MW solar power project under the National Solar Mission (NSM) Phase II, Batch III, which was recently put up for auction by the Solar Energy Corporation of India (SECI). Azure Power secured 50 MW of the total 100 MW capacity auctioned and will supply power to SECI for 25 years. The project will be built in the Ananthapuramu Solar Park, which is being developed by the Solar Park Implementation Agency (SPIA), Andhra Pradesh Solar Power Corporation Limited (APSPCL).
The tariff on the project will be Rs 4.43 per kWh ($0.067) with an additional support of Rs 12.7 million per MW ($0.19 million) from the Government of India in terms of Viability Gap Funding (VGF). This makes the levelised tariff of this project significantly higher than the levelised tariff of the lowest bid, including VGF, under SECI auctions in NSM Phase II, Batch III.
Inderpreet Wadhwa, Founder and Chief Executive Officer, Azure Power said, “Azure Power maintains a strong track record of winning projects under every phase of (the) National Solar Mission policy. With this win, we have once again demonstrated our strong project development capabilities. We are delighted to make a contribution towards the realisation of our Prime Minister’s commitment towards clean and green energy, through solar power generation.”
Azure Power has been among the most active participants in several solar power auctions since the launch of the solar power market in India. With a portfolio of over 1,000 MW, the majority of the companyÂ’s projects are with creditworthy customers backed by the sovereign Government of India.
FlashNews:
India’s Ports Surge in Efficiency, Investment: Union Minister Sonowal
Air India Completes DGCA-Mandated Fuel Switch Inspections on Boeing Fleet
Genesys First in India to Link DIGIPIN with 2D and 3D Maps for Digital Address Infrastructure
India’s Rajya Sabha Passes Bills of Lading, 2025: A Landmark Maritime Reform
Rail Car Inspections Begin on Vaitarna-Kharbo Stretch; Western DFC Nears Completion
DEL Vibes: Immersive Cultural Showcase Launched at Delhi International Airport
CS TECH Ai Named PMC for ₹58.1 Million Sewage Revamp in Nashik
India’s ₹35 Trillion Energy Push Hinges on States, Says Puri at Urja Varta
Lending Versatility to Modern Infrastructure with Coated Steel
India Post to Grow Revenue by 30% in FY26 under Scindia’s Vision for Performance-Driven Public Service
Solar Now Far Cheaper Than Conventional Energy as Tariffs Fall: Joshi
India Surpasses Clean Energy Goal with 50% of Grid Now Powered by Non-Fossil Sources
Mumbai-Ahmedabad Bullet Train to Launch with Japan’s Next-Gen Shinkansen Technology
From Trade to Tourism, Sonowal Envisions a New Global Role for BIMSTEC
Railways to Begin Massive CCTV Rollout Across Trains to Boost Onboard Security
Ceinsys Tech Wins ₹1.15 Billion MMRDA Contract for Real-Time Infrastructure Monitoring Platform
Siemens Secures ₹7.73 Billion Contract for Nagpur Metro’s Advanced Signalling and Telecom Systems
DFCCIL Launches India’s First Private Gati Shakti Cargo Terminal on Western Freight Corridor
India Clears Elon Musk’s Starlink for Satellite Internet Rollout
Home » Azure Power wins 50 MW solar power project under SECI auction
Azure Power wins 50 MW solar power project under SECI auction
Power & New and Renewable Energy
December 26, 2016December 26, 2016

Leave a Reply
You must be logged in to post a comment.