Azure Power, a leading Indian solar power producer, has announced that it has won a 50 MW solar power project under the National Solar Mission (NSM) Phase II, Batch III, which was recently put up for auction by the Solar Energy Corporation of India (SECI). Azure Power secured 50 MW of the total 100 MW capacity auctioned and will supply power to SECI for 25 years. The project will be built in the Ananthapuramu Solar Park, which is being developed by the Solar Park Implementation Agency (SPIA), Andhra Pradesh Solar Power Corporation Limited (APSPCL).
The tariff on the project will be Rs 4.43 per kWh ($0.067) with an additional support of Rs 12.7 million per MW ($0.19 million) from the Government of India in terms of Viability Gap Funding (VGF). This makes the levelised tariff of this project significantly higher than the levelised tariff of the lowest bid, including VGF, under SECI auctions in NSM Phase II, Batch III.
Inderpreet Wadhwa, Founder and Chief Executive Officer, Azure Power said, “Azure Power maintains a strong track record of winning projects under every phase of (the) National Solar Mission policy. With this win, we have once again demonstrated our strong project development capabilities. We are delighted to make a contribution towards the realisation of our Prime Minister’s commitment towards clean and green energy, through solar power generation.”
Azure Power has been among the most active participants in several solar power auctions since the launch of the solar power market in India. With a portfolio of over 1,000 MW, the majority of the companyÂ’s projects are with creditworthy customers backed by the sovereign Government of India.
FlashNews:
Advantage Assam: Trust, Governance and Growth Under Prime Minister Modi
Near Western Dedicated Freight Corridor Completion, DFCCIL Chief Inspects JNPA‑Vaitarna Stretch
Union Cabinet Clears $146 Million Delhi Metro Expansion, Adding 16 km and 13 Stations
Saleem Ahmad Takes Charge as RVNL CMD, Steering Shift to All‑Infra Vision
Clean Leap: Manohar Lal Inaugurates First Unit of 2,000 MW Subansiri Hydropower Project
DFCCIL Pushes Fast-Track Plan for Gati Shakti Cargo Terminals
Chhattisgarh, GAIL Ink MoU for 1.27‑Million‑Ton Gas‑Based Fertiliser Plant
Noida International Airport Taps Tech Mahindra for 24×7 Cybersecurity Command Centre
Centre Approves ₹8.87 Billion Mumbai Marina to Boost Coastal Shipping and Maritime Tourism
PM Surya Ghar Rooftop Solar Scheme Crosses 1.95 Million Installations, Delivers 770,000 Zero Bills
Waaree Gets ALMM-II Nod for 5.25 GW Solar Cells
Inox Wind Secures Repeat 100 MW Order from Jakson Green
SITA Strengthens India’s Digital Aviation Infrastructure as Passenger Growth Accelerates
India moved from power scarcity to sustainability, says Piyush Goyal
GM Rao Urges Andhra University Alumni to Drive Innovation, Entrepreneurship and India Growth Story
India Begins Hydrogen Car Trials as Minister Joshi Drives Toyota Mirai to Parliament
MNRE Refutes Financing Pause; Calls for Expansion into Upstream Solar Manufacturing
IndiGrid to Acquire Gadag Transmission for ₹3.72 Billion
India Launches First All‑Electric Tug at Deendayal Port, Accelerates Green Maritime Shift
Home » Azure Power wins 50 MW solar power project under SECI auction
Azure Power wins 50 MW solar power project under SECI auction
Power & New and Renewable Energy
December 26, 2016December 26, 2016


Leave a Reply
You must be logged in to post a comment.