Tata Steel expects to operationalise three million tonne steel plant in the first phase of its six million tonne greenfield steel project at Kalinga Nagar, by March 2014. This is despite the fact that the company has not been able to get raw material security for the project as allotments of mines are yet to come through. The project is co
FlashNews:
Location Intelligence: The Invisible Layer Powering Indiaâs Digital Public Infrastructure
AI Data Centre Leaders Map Indiaâs Infrastructure Roadmap
Welspun One Signs 15,232 Sq. Ft. with Aditya Birlaâs Novel Jewels at WTC Thane
NHAI Launches Framework to Share Highway Data with IITs, NITs and CSIRâCRRI
UDAN 2.0: Indian Aviationâs Next Act
The Apprenticeship Anchor
Managing Indiaâs Data Centre Surge
Real-Time Public Works
Global Trade at Crossroads
From Cloud to Energy: Indiaâs Geopolitical Stress Test
The Economics of Road Safety
When Climate Hits the Grid
AI Factories: Turning Data to Scale
Nuclear power an inevitable option for Net Zero emission by 2070 and developed India by 2047
Digital Indiaâs Beating Heart
AI is the transformative engine of the next century
Data Centres: The New Cosmos
Air India to Move Operations to JFKâs New Terminal 6 in 2028
Indofast Energy-Hala Mobility Alliance to Deploy 40,000 EVs by 2027
Hyderabad Metro project gets new steel cutting unit
Andhra Pradesh Urban Development Minister Maheedhar Reddy recently unveiled an automated steel cutting and bending plant that would be beneficial for the ongo
ANIIDCO transports steel materials to govt
Andaman and Nicobar Islands Integrated Development Corporation (ANIIDCO) has been the nodal agency for procurement and supply of steel materials
Copper makers suffer from high duty on raw material
Small and micro copper manufacturers in the country complain that their operation was unsustainable because of high import duty for raw material and less duty
Superior to conventional piping
The double wall corrugated (DWC) polyethylene piping system has been globally designated as a major instrument in non-pressure (gravity flow) conĂÂveyance of wastewater/storm draiĂÂnage/industrial effĂÂluent especially in renewal and extension of urban infrastructure.
PPT for more container cargo
In view of the sharp drop in iron ore traffic, the Paradip Port Trust (PPT) is tapping other commodities to boost its total throughput.
Alom Poly Extrusions: Lighter and stronger
Alcorr double-wall corrugated pipes made of extrĂÂemely versatile raw material called high-density polyethylene (HDPE) are composed of two layers having glass smooth inner wall and annular corrugated outer configuration.
Mazagon Dock, Pipavav JV on hold
The Defence Ministry has decided to put on hold a joint venture (JV) between Mazagon Dock and Pipavav Defence and Offshore Ltd, saying it would wait till a policy on JVs is put in place by the govĂÂeĂÂrĂÂnĂÂment.
Double-stack container train
Railways have decided to run double stack container trains between Gurgaon and Mundra Port in Gujarat. This will provide a boost to the transportation of cars, steel and consumer goods.
Tourism infra deal
For development of tourism infrastructure in the state, Himachal Pradesh government, signed a $95.16 million loan agĂÂreement with Asian DevelopĂÂmĂÂent Bank (ADB).

