Essar Energy plc has completed a 35-day shutdown of its Vadinar refinery in Gujarat that helped it to tie-in new units required for a $1.85 billion capacity expansion. The phase I expansion will increase refinery capacity from 300,000 barrels per day (bpd) to 375,000 bpd and increase the complexity of the refinery from 6.1 to 11.8, allowing for the processing of a much higher percentage of heavy and ultra heavy crude oils and the production of a higher value product mix.
FlashNews:
Airtel, Google, and AdaniConneX to Build India’s First $15 Billion AI and Data Hub in Visakhapatnam
Air India Adds 166 Festive Flights to Patna for Diwali and Chhath Puja
THINK Gas Cuts CNG and DPNG Prices Across UP, Bihar, and Punjab Ahead of Festive Season
Hinduja Renewables Appoints Deepak Thakur as MD & CEO
India’s GalaxEye to Launch World’s First Multi-Sensor Satellite: One to Rule Them All
India Designates Three Major Ports as Green Hydrogen Hubs under National Mission
Karnataka Partners with SIA-India to Launch India’s First State-Led Space Technology Centre
IndiGo Expands UK Reach with More Flights to Manchester and London Heathrow
ENGIE Secures 100 MW Solar PPA with SECI, Expands Rajasthan Portfolio to 1 GW
Air India Adds Fourth Daily Delhi-London Flight, Expands UK Network for Winter 2025
IMC 2025: Scindia Highlights India’s Digital Leap in Manufacturing, Startups
Lotus Takes Flight: Mumbai’s Aviation Horizon Expands as PM Modi Launches Navi Mumbai International Airport
NMIA Ripple: Real Estate Activity Accelerates Across Panvel and Navi Mumbai
Avaada Group Commits ₹360 Billion to Gujarat’s Green Energy Push at Vibrant Gujarat 2025
India’s Solar Push Goes Local: Minister Joshi Highlights People-Centric Energy Transition at ISA Curtain Raiser
IndiGo Unlocks Nordic Gateway with Direct Mumbai-Copenhagen Flights
IMC 2025: Satcom Summit Calls for Space Networks to Bridge Digital Divide
Air India-STARLUX Interline Deal Opens Seamless Access to Taiwan via Southeast Asia Gateways
Sembcorp to Acquire ReNew Sun Bright, Expanding India Solar Portfolio to 6.9 GW
Home » Essar completes Vadinar refinery expansion
Essar completes Vadinar refinery expansion
Power & New and Renewable Energy
November 1, 2011November 1, 2011

Leave a Reply
You must be logged in to post a comment.