Petronet LNG is mulling to invest $1 billion to set up a 5 million metric tonne per annum liquefied natural gas (LNG) terminal on the east coast. The terminal will take up to five years to build. The pre-feasibility report had studied 5-6 locations, including Kakinada in Andhra Pradesh.
FlashNews:
GAIL Posts ₹69.68 Billion Profit for FY2025-26 Amid Global Headwinds
RRP Defense Secures ₹298 Million BEL Order for Germanium Lenses
Noida International Airport: India’s New Visiting Card
India, Korea Ink Landmark MoU for Thoothukudi Mega Greenfield Shipyard
Air India Slashes 29 International Routes Amid ATF Price Surge
WABAG, PEAK Partner on Ghaziabad Bio-CNG Plant to Boost Energy Security
DFCCIL, ICFAI Forge Partnership to Drive Innovation in Logistics
S&P Urges Breaking Barriers as India Growth Outlook Moderates
Bhutan, World Bank Seal $515 Million Pact for Dorjilung Hydropower
REC Posts Record ₹162.8 Billion Profit, Declares Highest Dividend
India’s Infrastructure Investments to Surge 50% Despite Global Uncertainties: Crisil Ratings
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate India’s Smart Meter Rollout
Delhi Airport Unveils Multi‑Lingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
Home » Petronet to set up 5 mnt terminal
Petronet to set up 5 mnt terminal
Aviation & Airports
August 1, 2011August 1, 2011


Leave a Reply
You must be logged in to post a comment.