The Bangalore Development Authority (BDA), which is building a signal-free corridor between Sirsi Circle and Agara, plans to complete the restoration work on Sarjapur Road and 80-feet road in four months. The announcement has brought some cheers to the residents of Koramangala and other road users.
FlashNews:
Indiaās Infrastructure Investments to Surge 50% Despite Global Uncertainties: Crisil Ratings
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate Indiaās Smart Meter Rollout
Delhi Airport Unveils MultiāLingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ā¹90āÆBillion Growth for FY2026ā27
StarāÆAir Launches 70āÆWeekly Flights, Introduces FirstāEver Direct Mundra-DelhiāÆNCR Route
Indiaās Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
āRVNL Delivers 17,000 km Rail Projects, Executes ā¹2 Trillion Infrastructure:ā Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puriās Doha Visit
IRB Group Reports ā¹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for PunatsangchhuāII, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer Indiaās First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lalās 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
Tag: Bangalore Development Authority
B’lore needs funds for 25-km elevated road
The Bangalore Development Authority (BDA)?has decided not to take up the proposed Ćāgolden quadrilateralĆā project to construct 25-kilometres of elevated road in the city under the Public-Private Partnership (PPP)?model as planned earlier.
New PRR to ease traffic pressure on Bengaluru
The Bangalore Development Authority (BDA) is preparing a detailed project report (DPR) for the Peripheral Ring Road (PRR) project. The State government is ready to release funds for the public-private venture project. The 116 km road, that will circumnavigate the Indian IT city, will ease traffic on the Outer Ring Road by over 50 per cent and provide connectivity between State highways and national highways.
New PRR to ease traffic pressure on Bengaluru
The Bangalore Development Authority (BDA) is preparing a detailed project report (DPR) for the Peripheral Ring Road (PRR) project. The State government is ready to release funds for the public-private venture project. The 116 km road, that will circumnavigate the Indian IT city, will ease traffic on the Outer Ring Road by over 50 per cent and provide connectivity between State highways and national highways.

