The newly inaugurated Sewerage Treatment Plant (STP) in Koramangala and Challaghatta (K&C) Valley STP, whose treatment capacity is 60 Million Liters per Day (MLD) is expected to treat the sewerage generated by around 5 lakhs people in Bengaluru, and improve the sanitation and environmental condition of the rapid growing city.
FlashNews:
Windergy India 2025: India Must Target 85% Local Content in Wind Projects by 2030, Says MNRE Minister
THINK Gas and Tata Motors Join Forces to Expand LNG Trucking Infrastructure
Otis India to Equip Mumbai-Ahmedabad Bullet Train Stations with 55 Elevators and Escalators
Alpex Solar to Commission 2.2 GW G12R TOPCon Cell Facility in Strategic Technology Pivot
IndiGo Adds Bengaluru-Riyadh Direct Flights to Expand Middle East Connectivity
Honeywell Unveils Biocrude Technology to Power Maritime and Aviation Decarbonisation
GREW Solar Unveils G12R Modules for Large-Scale Solar Projects
Inox Solar-LONGi Sign 5 GW Module Deal to Accelerate India’s Solar Manufacturing Push
India Crosses 500 GW Power Capacity; Renewable Generation Tops 50% on Record Day
IMW 2025: Strategic Fleet Ownership Key to India’s Energy Future
POWERGRID, NEA Ink Cross-Border Transmission Pact to Strengthen India-Nepal Power Ties
Rahul Jain Appointed as Suzlon CFO as RE Major Seeks to Expand Footprint
Gadkari Calls for Accountability and Innovation to Build World-Class Roads
India’s Solar Diplomacy Gains Momentum as Minister Joshi Calls for Equitable Energy Transition at ISA Plenary
Solar for All: President Murmu Urges Inclusive Energy Revolution at ISA Plenary
From Code to Concrete: Why the Smart Infrastructure Boom Needs Bobs to Become Tech Builders
Toll Revenues Surge to ₹491.9 Billion in Jan-Sept 2025, Driven by Higher Traffic and Revised User Fees: ICRA Analytics
IMW 2025: India positions itself as maritime bridge between Indo-Pacific and Global South, says Amit Shah
IMW 2025: Gadkari Calls for Private Innovation in Ship Financing, Launches Maritime Vision Report
Tag: BWSSB
Phase II work begins on Mysore road
After years of speculation, construction of Namma Metro project under phase II on Mysore Road is underway. The contractor of the project awarded by the Bangalore Metro Rail Corporation Limited (BMRCL) has started work.
High achiever
Umesh Ulavi, is currently serving as Vice President and Business Sector Head, Water Resource Management of Kirloskar Brothers Limited. He is the holder of bachelor degree of engineering in mechanical stream from College of Engineering Pune in 1979. He has more than 35 years of rich experience in the field of hydraulics and pumping systems.
We enable reduction in industry input costs
Pradeep Kumar Kharola, MD, Bangalore Metro Rail Corporation Ltd (BMRCL), tells Shashidhar Nanjundaiah that efficiency-of commute and technology-is the key mantra for the city's metro rail system, another "reach" of which will be operational soon.
Vox Pop: Experts provide solutions for urban wastewater management
From what model of PPP will work in our urban wastewater management to how they can move from a mostly secondary treatment to tertiary and make water viable, policymakers, city administrators and wastewater practitioners offer solutions.



