During the 12th five year plan period (2012-17), the government expects 72,339.6 mw of thermal power projects across the country. Of this, 3,960 mw is proposed in Odisha during the 12th plan period. This information was given by the union government through a press
FlashNews:
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate India’s Smart Meter Rollout
Delhi Airport Unveils Multi‑Lingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ₹90 Billion Growth for FY2026‑27
Star Air Launches 70 Weekly Flights, Introduces First‑Ever Direct Mundra-Delhi NCR Route
India’s Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
“RVNL Delivers 17,000 km Rail Projects, Executes ₹2 Trillion Infrastructure:” Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puri’s Doha Visit
IRB Group Reports ₹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for Punatsangchhu‑II, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer India’s First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lal’s 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
India Climbs to Third Globally in Renewable Energy Capacity, Adding Record 55 GW in FY2025-26
NTPC added 4 gw capacity in FY13
State-run power producer NTPC added 4,170 mw of generation capacity during 2012-13 surpassing its earlier best capacity addition of 2,820 mw in 2011-12. The company currently has an installed capacity of 41,184 mw through 16 coal based, two solar renewable, seven gas or liquid fuel and seven Joint Venture power stations
JSW Steel aims 10% growth in FY14
Sajjan Jindal, Chairman and Managing Director of JSW Steel said the firm aims to achieve 9-10 per cent growth in volume and sales during 2013-14. He said this while releasing the earnings results for March 2013 quarter and for the full year 2012-13. During 2012-13, the firm produced 8.52 mn t of steel, with average capacity utilisation of 80 per cent. The
VPT’s Rs 8.4 bn project faces roadblock
The union cabinet may have cleared the Rs 845 crore capacity enhancement and modernisation project at the existing iron ore facilities in the Visakhapatnam Port Trust. But labour unions are opposing the proposed project arguing that it may harm the interest of the port. Recently, United Port and Dock Employees Union staged a dharna in front of administrative building of the port against the approval of the Cabinet Committee of Economic Affairs
World steel output grows 1.2% in April
Global steel production grew 1.2 per cent in April 2013 to 132.11 million tonne (mn t) compared to 130.50 mn t in the corresponding month of previous year, data from the World Steel Association shows. It is noteworthy that nearly half of the global production has come from China at 65.65 mn t during the month. Steel output in the country grew 6.8 per cent over the same month last year, data the association shows
Govt to include panel suggestions for future JNNSM projects
Union ministry for New and Renewable Energy said it incorporated the suggestions given by an inter-ministerial committee to strengthen guidelines for selecting EPC contractors for projects under the Jawaharlal Nehru National Solar Mission (JNNSM). Following allegation of irregularities in implementing projects under JNNSM, the ministry set up the inter-minis
CCEA to consider Rs 845 cr Vizag Port project
The Cabinet Committee on Economic Affairs (CCEA) would decide on clearing the Rs 845 crore capacity enhancement project in Vishakhapatnam Port. The project involves upgradation of the existing facility and creation of an iron ore handling terminal. The terminal for handling iron ore would be set up on DBFOT (Design, Build, Finance, Operate and Transfer) basis in
Proposed port in AP to boost cargo volume from east coast
Industry chambers feel that the proposed Rs 8,000 crore major port in at Dugarajapatnam in Vakadu 'mandal' or block of Andhra Pradesh may boost export and import from the east coast and contribute to the economic progress of the state. It may be noted that the Cabinet Committee on Economic Affairs recently cleared the proposed port project, which is coming up on a 5,000 acre land in the stat
Paradip port focuses on mechanising berths
SS Misra, Chairman of Paradip Port Trust (PPT) informed that the port management has given top priority to berth mechanisation and acquisition of two mobile harbour cranes. He said this while explaining the cargo volume handled by the port in April 2013. During the month, the port handled 5.65 million tonne (mn t) of traffic, thus posting 4.24 per cent growth over the same period
NMDC produced 27 mn t iron ore in FY13
NMDC produced 27.3 million tonne (mn t) and supplied 26.91 mn t of iron ore to domestic industries during the year 2011-12, which is around 16 percent of the countryÂ’s total production of iron ore of 167.28 million tonne (provisional). Government of India said this in a press release. This is around 23 percent of the total estimated consumption of about 116.3 mn t of iron ore by the dom

