When we reflect on the developments in the power sector in 2012, we find that it was a mixed bag. The generation sector saw a phenomenal, unprecĂÂedented, capacity additĂÂion thus, bridging the energy gap to a great extent. Today, the total installed generation capaĂÂcity is over 209,000 MW after an addition of over 50,000 MW in the 11th 5 year plan period.
FlashNews:
India Seeks Fair Maritime Rulebook as Sonowal Engages Korean Industry
The Great Office Reset
Intelligence for Infrastructure
UAVs: Governance from Above
Reshaping Global Logistics
Digital Oilfieldâs Network Frontier
Capital Pathways to Infrastructure
DHL Express is ready for Indiaâs scale and complexity
India is a centre for unique, highâvalue workplaces
Weâre evolving into a technology-agnostic company
ConTech 2026: Building Beyond Blueprints
On Fast Tracks to Viksit Bharat
The Techno-Structure Imperative
From Learning to Building: Knowledge as the New Foundation for Growth
India Needs Workforce Continuity Crisis Mandate
Powering Freight Growth
Beyond Climate, Water Stress is an Infrastructure Challenge
The Next Logistics Advantage
High-Speed Rail: A Network Vision
Home » Central Power Utility

