The profitability of the Vizhinjam international container transhipment terminal (ICTT) is under question because of the annual maintenance requirement after every monsoon season. According to hydrographic surveyor Commander John Jacob Puthur (retd), the terminal requires dredging after each monsoon to remove at least 3 million cubic metre of silt at a minimum annual maintenance cost of Rs 3
FlashNews:
Hindalco to be a force for good with engineered solutions transformation: Kumarmangalam Birla
HSR Needs Fast Tracking
RECPDCL Handovers Ratle Kiru Power Transmission Limited, a SPV of Transmission Project, to IndiGrid 2 Private Limited
RECPDCL Handovers 3 Nos. SPVs of transmission projects viz. Banaskantha Transco Limited, Kurnool-IV Transmission Limited & Rajasthan V Power Transmission Limited to Power Grid Corporation of India Limited
Showcasing India’s Supply Chain Revolution
Highlighting the Future of Smart, Sustainable Infra
Driving Sustainability Through Innovation
REC Signs ₹18,360 Cr MoU with Govt. of Kerala for Pump Storage Projects
IIFCL Launches its Gender Equality and Social Inclusion (GESI) Cell on the occasion of International Women’s Day 2025.
IIFCL and CBI Sign Expression of Interest to promote Sustainable Infrastructure Financing in India
CCI India presents 1st edition of CEO Round Table Conference on Agriculture
Jayesh Ranjan & Cement Expo Forum Leaders converge in Hyderabad
Fluence Launches Advanced Smartstack Platform for New Energy Storage Era
NBCC inks MoU with NIT Kurukshetra valuing Rs. 300 Crore
REC Foundation Commits ₹6 Crore to Sankara Eye Hospital for Cataract Surgeries Benefiting 8,000 EWS Patients
Integrated Exhibition Cum Convention Centre (IECC), better known as Bharat Mandapam, achieves prestigious GRIHA 4-Star Rating
REC Limited Signs Agreement with CVPPL, to provide ₹2147.508 Crore Term Loan to Develop 1000MW Pakal Dul Hydro Electric Project
NBCC Reports Robust 40% Surge in Net Profit
The time to invest in India’s energy sector is now, says PM Modi
Home » channel
Tag: channel
Board of Cochin Shipyard to discuss disinvestment plan
The board of Cochin Shipyard would discuss the proposed disinvestment of government in the company when it meets in June. In a first disinvestment in the sector, the government plans to offload 10 per cent stake in the company. This is part of the Rs 54,000 crore divestment target set by the government for 2013-14. The target is almo
CSL to spend Rs 490 cr to develop ship repair facility
Cochin Shipyard (CSL) would spend around Rs 490 crore to develop an international ship repair facility on a 41 acre land in the western side of Willingdon Island facing the Mattancherry channel. In September 2012, the Cochin Port Trust awarded the project to the Cochin Shipyard. The facility will enable ships visiting Kochi port undertake both floating and docking repairs