The profitability of the Vizhinjam international container transhipment terminal (ICTT) is under question because of the annual maintenance requirement after every monsoon season. According to hydrographic surveyor Commander John Jacob Puthur (retd), the terminal requires dredging after each monsoon to remove at least 3 million cubic metre of silt at a minimum annual maintenance cost of Rs 3
FlashNews:
Sovereign Cloud Emerges as Indiaās AIāReady Digital Foundation
Shivalaya Construction Secures ERESā47 Transmission SPV for Eastern Grid Expansion from RECPDCL
Indiaās Open Mobility Pioneer Takes Its RideāHailing Model to Europe
NTPC, Africa50 Join Forces to Develop Power Projects Across Africa
NHAI Introduces Independent Design Checks for Major Bridges and Critical Highway Structures
SITA to Acquire Collins Aerospace Airport Solutions, Expanding Global Airport Technology Capabilities
RITES Dispatches First 18āCoach Rake to Bangladesh Railway under Export Contract
AM/NS India Signs Pact to Upgrade Four ITIs in Andhra Pradesh under PMāSETU
KONE Opens Indiaās First Digital Experience Centre in Pune to Drive Smart Building Innovation
NTPC Seeks Industrial Partners for 26% Equity in CoāGeneration Projects
India Businesses Advance AI, Digital Tools and Sustainability: Autodesk Report
Modi Opens India Mobile Congress, Says Nation Has Shifted from Consumer to Creator
Air India, Akasa Join IndiGo in Raising Fares as ATF Costs Surge 25%
Tata Power Partners with Norwayās Ocean Sun to Pilot MembraneāBased Floating Solar in India
New Relic Rolls Out InfrastructureāÆ360 for Faster, Smarter AI Operations
Inox Green Completes ā¹5.5āÆBillion Acquisition of Wind Worldās 4.5āÆGW O&M Business
Air India, Singapore Airlines Deepen Partnership to Expand Travel Options, Loyalty Benefits
Alok Tiwari Takes Additional Charge as DFCCIL MD, Pushes TechāDriven Freight Corridor Agenda
India Launches Integrated Transport & Logistics Authority to Cut Costs and Boost Connectivity
Home » channel
Tag: channel
Board of Cochin Shipyard to discuss disinvestment plan
The board of Cochin Shipyard would discuss the proposed disinvestment of government in the company when it meets in June. In a first disinvestment in the sector, the government plans to offload 10 per cent stake in the company. This is part of the Rs 54,000 crore divestment target set by the government for 2013-14. The target is almo
CSL to spend Rs 490 cr to develop ship repair facility
Cochin Shipyard (CSL) would spend around Rs 490 crore to develop an international ship repair facility on a 41 acre land in the western side of Willingdon Island facing the Mattancherry channel. In September 2012, the Cochin Port Trust awarded the project to the Cochin Shipyard. The facility will enable ships visiting Kochi port undertake both floating and docking repairs

