The profitability of the Vizhinjam international container transhipment terminal (ICTT) is under question because of the annual maintenance requirement after every monsoon season. According to hydrographic surveyor Commander John Jacob Puthur (retd), the terminal requires dredging after each monsoon to remove at least 3 million cubic metre of silt at a minimum annual maintenance cost of Rs 3
FlashNews:
FLY91 Strengthens Leadership Team with Seasoned Aviation Executives to Drive Regional Growth
Sonowal Calls for Technology‑Led Maritime Security as India’s Port Network Grows
Civil Aviation Minister Naidu Expands Pilot Training Network with 11 New FTOs
INS Malvan Commissioned with AM/NS India Steel Backbone
Air India Names Tewolde Gebremariam CEO & MD to Drive Global Expansion
PM Surya Ghar: Muft Bijli Yojana Crosses 5 Million Rooftop Solar Installations
Delhi Airport Expands Domestic Network to 90 Destinations with Launch of Direct Flights to Daman
Jupiter Wagons, Lucchini RS to Build India’s First Fully Integrated Private‑Sector Railwheel Manufacturing Platform
Willie Walsh Takes Charge as IndiGo CEO
Indian Railways Posts 9% Freight Growth in July 2026
PM Modi Dedicates POWERGRID Transmission Projects for Clean Energy in Andhra Pradesh
AM/NS India Highlights Long‑Life Solar Infrastructure with Magnelis for 300 GW Ambition
RECPDCL Hands Over Ryapte Transmission SPV to Tata Power
India’s Rooftop Solar Push Accelerates as PM Surya Ghar Nears 5 Million Homes
PM Modi Looks East to Future After Bhogapuram Airport Unveiling
India Approves ₹50.7 Billion Scheme for Floating Solar Projects with Energy Storage
Air India, SkyDrive, and Suzuki Join Forces to Explore eVTOL Medical Logistics in India
REC, PFC Seal ₹268.5 Billion Loan Deal for 2,400 MW Meja Thermal Project
Tata Power Renewables Breaks Ground on 800 MW Hybrid Project in Andhra Pradesh
Home » channel
Tag: channel
Board of Cochin Shipyard to discuss disinvestment plan
The board of Cochin Shipyard would discuss the proposed disinvestment of government in the company when it meets in June. In a first disinvestment in the sector, the government plans to offload 10 per cent stake in the company. This is part of the Rs 54,000 crore divestment target set by the government for 2013-14. The target is almo
CSL to spend Rs 490 cr to develop ship repair facility
Cochin Shipyard (CSL) would spend around Rs 490 crore to develop an international ship repair facility on a 41 acre land in the western side of Willingdon Island facing the Mattancherry channel. In September 2012, the Cochin Port Trust awarded the project to the Cochin Shipyard. The facility will enable ships visiting Kochi port undertake both floating and docking repairs

