The infrastructure sector is highly responsible for propelling India's overall development. With intense focus, the government has initiated policies to ensure time-bound creation of world-class infrastructure in the country.
FlashNews:
Suzlon Secures Maiden 200 MW Wind Order from Ayana Renewable Power
Tata Power Solaroof Crosses Half‑Million Rooftop Milestone, Targets 3 Million by 2029
REC Issues India’s First Tokenised Corporate Bonds Under SEBI Sandbox
IndiGo to Begin Guwahati-Bangkok Flights, Expanding Northeast India’s Global Reach
Suhora Technologies Launches Open Satellite Platform to Support Nepal Flood Response
WABAG Wins RIL Repeat Order for Advanced ETP at Jamnagar
Homegrown Airtel Cloud Seeks to Support India’s Sovereign Manufacturing AI
Air India’s VT‑AWD Dreamliner Arrives After Completing 500 Checks
RVNL Secures ₹90.3 Billion Order for Rail Connectivity to Buxar Thermal Power Project
Air India and IHG Hotels & Resorts Forge Loyalty Partnership
RVNL Emerges Lowest Bidder for ₹40.49 Billion EPC Package in Odisha
ISRO’s GSLV-F17 Launches EOS-05, India’s First Geosynchronous Imaging Satellite
Inox Wind Secures ₹7.55 Billion Repeat Order from Indian Oil
FLY91 Signs $1 Billion ATR Order to Drive Regional Aviation Growth
Esri Launches Linux‑Based GeoSARAL to Tap India’s Expanding GIS Market
Tata Power Commissions 400 kV Jalpura-Khurja Corridor to Strengthen NCR Grid
UrbanVault Expands into Chennai with 100,000 Sq. Ft. Across Three Properties
Naidu Chairs High‑Level Committee to Strengthen Aircraft Leasing and Financing
Windergy India 2026: Wind Sector Targets 100 GW with Manufacturing, Offshore and Repowering
Tag: Components
Needed, Politics of Consensus
Mid-week, on the December 22, 2016 morning the radio channels blared out a slew of infrastructure projects the Devendra Fadnavis government in Maharashtra would be inaugurating at the hands of India's Prime Minister Narendra Modi, a couple of days later.
Inter-modality is one of the key components of our approach
The cooperation between IR and French Railways is on two fronts currently. One is the semi high-speed passenger train service between Delhi and Chandigarh. The second is the renovation study of two stations also between Delhi and Chandigarh - the stations at Ambala and Ludhiana.
Herrenknecht has a wide and long experience as well as a lot of references in India
Tunnels play a key role in many projects, because they are very often key components on routes. Modern tunnel boring machines and construction technologies make it possible to build routes that run very close to ideal lines, bringing a real breakthrough for routes that would have been inconceivable in earlier times.
SE Railway achieved a 7.1% higher freight loading
South Eastern Railway achieved a 7.1 per cent higher freight loading at 97.70 million tonne of revenue earning freight during the first nine months of the current financial year (April-December, 2015).
Now, no need for registration of SRUs
In order to boost ease of doing business in the ship repair sector, the Ministry of Shipping has eased the procedure and has dropped the requirement of registration of Ship Repair Units (SRUs) with Directorate General (Shipping).
MMRCL appoints General Consultant for Mumbai Metro Line 3
Mumbai Metro Rail Corporation Limited (MMRCL) has appointed AECOM Asia Company Ltd-led consortium as the General Consultant for the prestigious Mumbai Metro Line 3 (Colaba-Bandra-SEEPZ 33.5 Km long and fully underground) project.





