The construction of the runway at the upcoming Kannur airport will begin in 2012 and flight operations are expected to commence by 2014, according to the state Minister for Ports, Excise and Airports, K Babu.
FlashNews:
NTPC, Africa50 Join Forces to Develop Power Projects Across Africa
NHAI Introduces Independent Design Checks for Major Bridges and Critical Highway Structures
SITA to Acquire Collins Aerospace Airport Solutions, Expanding Global Airport Technology Capabilities
RITES Dispatches First 18‑Coach Rake to Bangladesh Railway under Export Contract
AM/NS India Signs Pact to Upgrade Four ITIs in Andhra Pradesh under PM‑SETU
KONE Opens India’s First Digital Experience Centre in Pune to Drive Smart Building Innovation
NTPC Seeks Industrial Partners for 26% Equity in Co‑Generation Projects
India Businesses Advance AI, Digital Tools and Sustainability: Autodesk Report
Modi Opens India Mobile Congress, Says Nation Has Shifted from Consumer to Creator
Air India, Akasa Join IndiGo in Raising Fares as ATF Costs Surge 25%
Tata Power Partners with Norway’s Ocean Sun to Pilot Membrane‑Based Floating Solar in India
New Relic Rolls Out Infrastructure 360 for Faster, Smarter AI Operations
Inox Green Completes ₹5.5 Billion Acquisition of Wind World’s 4.5 GW O&M Business
Air India, Singapore Airlines Deepen Partnership to Expand Travel Options, Loyalty Benefits
Alok Tiwari Takes Additional Charge as DFCCIL MD, Pushes Tech‑Driven Freight Corridor Agenda
India Launches Integrated Transport & Logistics Authority to Cut Costs and Boost Connectivity
India’s Infrastructure Future Hinges on Making Projects Investable and Tech‑Driven: Deloitte Survey
FLY91 Expands Regional Network with Ceremonial Touchdown at Navi Mumbai International Airport
Brahmaputra Set to Reclaim Global Role as Dibrugarh Sends First Cargo to Bangladesh
Tag: environmental clearance
APP: set up EGoM on coal contracts
The Association of Power Producers (APP) has demanded setting up of an empowered grÂoup of ministers (EGoM) to reÂview the current bidding conÂtracts in view of the coal shortage.
Solar needs no green nod
The union ministry for environment and forests has clarified that no environmental clearance is required for solar PV power projects.
AP power project grounded
Nava Bharat Ventures has decided to put on hold the proposed 150 MW thermal plant at Dharmavaram due to delays in environmental clearance.
Centre mulls OVER terminal
The government plans to build a mega container terminal that can handle four million twenty feet equivalent units (TEUs) of containers per annum at Chennai.
DoT to impose fine on infra companies
The Department of Telecommunications (DoT) will impose a fine of Rs 5 lakh each on infrastructure firms if their base transceiver stations (BTS) have not received environmental clearance by 15 November.
- 1
- 2

