Kolkata Port Trust (KoPT) has proposed to split the scope of work at berths 2 and 8 at Haldia to facilitate the exit of Haldia Bulk Terminal (HBT).
FlashNews:
Vikram Solar Rolls Out First Module at Tamil Nadu Mega‑Facility
AI‑Driven Governance for Capital Projects
India Needs a Comprehensive Approach to Data Sovereignty and Resilience: AS Kiran Kumar
Why India’s Logistics Costs Will Not Fall Through Infrastructure Alone
PM Modi to Dedicate HPCL Rajasthan Refinery, India’s First Greenfield Integrated Complex
Mumbai Port Unveils ₹50.29 Billion Projects on 154th Foundation Day
RVNL Completes Sitafalmandi-Lallaguda Chord Line, Boosting Hyderabad Rail Connectivity
Tata Power Commissions 100.8 MW Jewali Wind Project in Maharashtra
Skyroot Sets Launch Window for India’s First Private Orbital Rocket
India’s ACME Group Seals Landmark Green Ammonia, Methanol Deals with Japan
Indian Railways Posts 4% Freight Growth in June 2026
India, Japan Join Hands to Build Energy Resilience
Adar Poonawalla Family Office Invests ₹700 Crore in Inox Clean Energy
India-EU Set to Deepen Cooperation on Sustainable Ship Recycling
Saleem Ahmad Takes Additional Charge as CMD of IRCON, Strengthening Synergy with RVNL
India’s WABAG Secures Vienna Order for Donauinsel Water Works Expansion
Tech Cuts Mishandled Bag Rates by 23%, But $6.3 Billion Cost Persists: SITA
SK Sinha Appointed Director Finance at GAIL, Bringing Three Decades of Expertise
NHAI to Empanel IITs for Independent Proof Checking of Bridge Designs
Home » Haldia Bulk Terminal
Tag: Haldia Bulk Terminal
CPT loses cargo volume due to exit of HBT
RPS Kahlon, Chairman of Calcutta Port Trust remarked that the exit of Haldia Bulk Terminal (HBT) is one of the reasons for the port losing out on 3-4 million-tonne of cargo in 2012-13. HBT, which is a mechanised cargo handler working in berth number 2 & 8 in Haldia Dock Complex (HDC), exited the contract with the port prematurely in November 2012

