In Mumbai, heavy water-logging at the Milan subway will no longer cause an inconvenience to motorists this monsoon, thanks to the Milan rail over bridge (RoB), which is set to open this month. According to the Mumbai Metropolitan Region Development Authority (MMRDA), the 700-metre RoB is finally ready for traffic will be ready for traffic by the end of this month.
FlashNews:
Kamarajar Port Joins Visakhapatnam as India’s Second 18‑Metre Deep‑Draft Port
El Niño Cuts 13 aGW Hydropower Across Asia, Forcing Coal and LNG Reliance
CUMI Named Armour Partner for DRDO’s Indigenous Vikram VT21 Combat Vehicles
CleanMax Achieves Record 530 MW Commissioning in Q1 FY2027, Expands Portfolio to 4.2 GW
POWERGRID Secures Landmark ¥80 Billion JBIC Green Loan for Clean Energy Push
Vikram Solar Rolls Out First Module at Tamil Nadu Mega‑Facility
AI‑Driven Governance for Capital Projects
India Needs a Comprehensive Approach to Data Sovereignty and Resilience: AS Kiran Kumar
Why India’s Logistics Costs Will Not Fall Through Infrastructure Alone
PM Modi to Dedicate HPCL Rajasthan Refinery, India’s First Greenfield Integrated Complex
Mumbai Port Unveils ₹50.29 Billion Projects on 154th Foundation Day
RVNL Completes Sitafalmandi-Lallaguda Chord Line, Boosting Hyderabad Rail Connectivity
Tata Power Commissions 100.8 MW Jewali Wind Project in Maharashtra
Skyroot Sets Launch Window for India’s First Private Orbital Rocket
India’s ACME Group Seals Landmark Green Ammonia, Methanol Deals with Japan
Indian Railways Posts 4% Freight Growth in June 2026
India, Japan Join Hands to Build Energy Resilience
Adar Poonawalla Family Office Invests ₹700 Crore in Inox Clean Energy
India-EU Set to Deepen Cooperation on Sustainable Ship Recycling
Home » In Mumbai
Tag: In Mumbai
SCLR bridge over Harbour Line to be opened soon
In Mumbai, the launch of ten segments of a steel bridge over the Harbour Line railway stations of Kurla and Tilak Nagar, which forms part of the much-delayed Santacruz-Chembur Link Road (SCLR) project, was completed on December 23.

