The Railways Minister also assured that fares on India’s first bullet train corridor between Ahmedabad and Mumbai would remain affordable, with a structure designed to be reasonable and accessible to the middle class. Union Minister for Railways Ashwini Vaishnaw has confirmed that execution-related delays during the Uddhav Thackeray-led government in Maharashtra pushed back the Ahmedabad-Mumbai...
FlashNews:
Suzlon Secures Maiden 200 MW Wind Order from Ayana Renewable Power
Tata Power Solaroof Crosses Half‑Million Rooftop Milestone, Targets 3 Million by 2029
REC Issues India’s First Tokenised Corporate Bonds Under SEBI Sandbox
IndiGo to Begin Guwahati-Bangkok Flights, Expanding Northeast India’s Global Reach
Suhora Technologies Launches Open Satellite Platform to Support Nepal Flood Response
WABAG Wins RIL Repeat Order for Advanced ETP at Jamnagar
Homegrown Airtel Cloud Seeks to Support India’s Sovereign Manufacturing AI
Air India’s VT‑AWD Dreamliner Arrives After Completing 500 Checks
RVNL Secures ₹90.3 Billion Order for Rail Connectivity to Buxar Thermal Power Project
Air India and IHG Hotels & Resorts Forge Loyalty Partnership
RVNL Emerges Lowest Bidder for ₹40.49 Billion EPC Package in Odisha
ISRO’s GSLV-F17 Launches EOS-05, India’s First Geosynchronous Imaging Satellite
Inox Wind Secures ₹7.55 Billion Repeat Order from Indian Oil
FLY91 Signs $1 Billion ATR Order to Drive Regional Aviation Growth
Esri Launches Linux‑Based GeoSARAL to Tap India’s Expanding GIS Market
Tata Power Commissions 400 kV Jalpura-Khurja Corridor to Strengthen NCR Grid
UrbanVault Expands into Chennai with 100,000 Sq. Ft. Across Three Properties
Naidu Chairs High‑Level Committee to Strengthen Aircraft Leasing and Financing
Windergy India 2026: Wind Sector Targets 100 GW with Manufacturing, Offshore and Repowering
Home » India’s first bullet train corridor
Tag: India’s first bullet train corridor
Mumbai-Ahmedabad Bullet Train’s 300 km Viaduct Milestone
India’s first bullet train corridor between Mumbai and Ahmedabad has reached a significant milestone with the completion of 300 km of viaducts. This achievement was marked by the launch of a 40-metre-long full-span box girder near Surat, Gujarat. The project has leveraged indigenously designed and manufactured equipment, including straddle carriers, launching gantries, bridge gantries, and...


