A new integrated terminal at Mumbai airport is ready for opening on January 15 and Air IndiaÂ’s Newark-Mumbai flight will be the first to arrive at the new terminal, say media reports. During the flight arrival transition, international operations will be suspended for a few hours.
FlashNews:
Air India, Akasa Join IndiGo in Raising Fares as ATF Costs Surge 25%
Tata Power Partners with Norway’s Ocean Sun to Pilot Membrane‑Based Floating Solar in India
New Relic Rolls Out Infrastructure 360 for Faster, Smarter AI Operations
Inox Green Completes ₹5.5 Billion Acquisition of Wind World’s 4.5 GW O&M Business
Air India, Singapore Airlines Deepen Partnership to Expand Travel Options, Loyalty Benefits
Alok Tiwari Takes Additional Charge as DFCCIL MD, Pushes Tech‑Driven Freight Corridor Agenda
India Launches Integrated Transport & Logistics Authority to Cut Costs and Boost Connectivity
India’s Infrastructure Future Hinges on Making Projects Investable and Tech‑Driven: Deloitte Survey
FLY91 Expands Regional Network with Ceremonial Touchdown at Navi Mumbai International Airport
Brahmaputra Set to Reclaim Global Role as Dibrugarh Sends First Cargo to Bangladesh
IndiGo Raises Fares as ATF Costs Surge
India Becomes Veolia Foundation’s Regional Emergency Response Hub for Asia-Pacific
Airtel Business Unveils IQ Gateway to Secure Enterprise Messaging at Scale
POWERGRID Veteran Akhilesh Pathak Takes Charge as Director Projects
India Rolls Out $28 Billion GOBARdhan Biogas Plan to Cut Imports, Boost Rural Economy
India’s Civil Aviation Demand is Outpacing Supply: Kinjarapu Ram Mohan Naidu
INDIA’S INFRA STORY IS SHIFTING TRACKS
India’s Green Hydrogen Mission Chief Urges Industry to Back Emerging Ecosystem
Global Trust as Essential as Scale in Green Hydrogen: Pralhad Joshi
Home » new integrated terminal
Tag: new integrated terminal
New terminal in Mumbai airport to open on Jan 15
A new integrated terminal at Mumbai airport is ready for opening on January 15 and Air IndiaÂ’s Newark-Mumbai flight will be the first to arrive at the new terminal, say media reports. During the flight arrival transition, international operations will be suspended for a few hours.
AAI team inspects new terminal at Kolkata airport
The new integrated terminal at Kolkata airport on April 4 was inspected by four officials from Airports Authority of India's planning department. The move follows complaints about the terminal's built quality and service by both passengers and MPs Derek O'Brien, Saugata Roy and Gurudas Dasgupta since it was commissioned three weeks ago.

