As many as three Re-gasified Liquefied Natural Gas (R-LNG) terminals exist now in the country while the fourth R-LNG terminal is under construction at Kochi (Kerala) by Petronet LNG (PLL). Giving this information in a written reply in the Lok Sabha recently, Panabaaka Lakshmi, Minister of State for Petroleum & Natural Gas informed that the Kochi RLNG terminal may be commissioned during 2013
FlashNews:
FLY91 Strengthens Leadership Team with Seasoned Aviation Executives to Drive Regional Growth
Sonowal Calls for Technology‑Led Maritime Security as India’s Port Network Grows
Civil Aviation Minister Naidu Expands Pilot Training Network with 11 New FTOs
INS Malvan Commissioned with AM/NS India Steel Backbone
Air India Names Tewolde Gebremariam CEO & MD to Drive Global Expansion
PM Surya Ghar: Muft Bijli Yojana Crosses 5 Million Rooftop Solar Installations
Delhi Airport Expands Domestic Network to 90 Destinations with Launch of Direct Flights to Daman
Jupiter Wagons, Lucchini RS to Build India’s First Fully Integrated Private‑Sector Railwheel Manufacturing Platform
Willie Walsh Takes Charge as IndiGo CEO
Indian Railways Posts 9% Freight Growth in July 2026
PM Modi Dedicates POWERGRID Transmission Projects for Clean Energy in Andhra Pradesh
AM/NS India Highlights Long‑Life Solar Infrastructure with Magnelis for 300 GW Ambition
RECPDCL Hands Over Ryapte Transmission SPV to Tata Power
India’s Rooftop Solar Push Accelerates as PM Surya Ghar Nears 5 Million Homes
PM Modi Looks East to Future After Bhogapuram Airport Unveiling
India Approves ₹50.7 Billion Scheme for Floating Solar Projects with Energy Storage
Air India, SkyDrive, and Suzuki Join Forces to Explore eVTOL Medical Logistics in India
REC, PFC Seal ₹268.5 Billion Loan Deal for 2,400 MW Meja Thermal Project
Tata Power Renewables Breaks Ground on 800 MW Hybrid Project in Andhra Pradesh
Tag: PLL
Petronet holds talks on Rs 6 bn LNG terminal project
Petronet LNG is said to be holding early stage discussion with the Andaman and Nicobar administration for setting up its first liquefied natural gas (LNG) terminal outside mainland India. The proposed mini-LNG terminal, which may cost about Rs 600 crore, may have an initial capacity of slightly over 0.5 million tonnes (mn t) and this would prim
Report on Petronet LNG deal expect in some weeks
According to media reports, a two-member team
appointed by the Petroleum Minister Veerappa Moily, to probe the alleged irregularities in the gas supply deal between Petronet LNG (PLL) and Qatar-based Ras Laffan, would submit its report in some weeks. The team was appointed by the Moily in January as the earlier inquiry ordered by former minister Jaipal Redd
PLL agrees to allot capacity to GSPL
Recently, Petronet LNG (PLL) signed an agreement with the Gujarat State Petronet to allot 1 Million Tonne Per Annum (MTPA) of capacity in its natural gas re-gasification terminal at Dahej. PLL agreed to allot the capacity to the firm for a period of 20 years starting from 2016

