The new open access will encourage private players to enter the power generation segment, The Electricity Act 2003 (EA) had given a five-year notice in 2004 to stakeholders for impleĆĀmenting open access (OA).
FlashNews:
From Jaipur to Russia: RUSAL Opens New Opportunities for Indian Workers
Sovereign Cloud Emerges as Indiaās AIāReady Digital Foundation
Shivalaya Construction Secures ERESā47 Transmission SPV for Eastern Grid Expansion from RECPDCL
Indiaās Open Mobility Pioneer Takes Its RideāHailing Model to Europe
NTPC, Africa50 Join Forces to Develop Power Projects Across Africa
NHAI Introduces Independent Design Checks for Major Bridges and Critical Highway Structures
SITA to Acquire Collins Aerospace Airport Solutions, Expanding Global Airport Technology Capabilities
RITES Dispatches First 18āCoach Rake to Bangladesh Railway under Export Contract
AM/NS India Signs Pact to Upgrade Four ITIs in Andhra Pradesh under PMāSETU
KONE Opens Indiaās First Digital Experience Centre in Pune to Drive Smart Building Innovation
NTPC Seeks Industrial Partners for 26% Equity in CoāGeneration Projects
India Businesses Advance AI, Digital Tools and Sustainability: Autodesk Report
Modi Opens India Mobile Congress, Says Nation Has Shifted from Consumer to Creator
Air India, Akasa Join IndiGo in Raising Fares as ATF Costs Surge 25%
Tata Power Partners with Norwayās Ocean Sun to Pilot MembraneāBased Floating Solar in India
New Relic Rolls Out InfrastructureāÆ360 for Faster, Smarter AI Operations
Inox Green Completes ā¹5.5āÆBillion Acquisition of Wind Worldās 4.5āÆGW O&M Business
Air India, Singapore Airlines Deepen Partnership to Expand Travel Options, Loyalty Benefits
Alok Tiwari Takes Additional Charge as DFCCIL MD, Pushes TechāDriven Freight Corridor Agenda
Tag: Power MInistry
Given our policies, we are lucky to get investors in India
Problems exist at both policy and execution levels in infrastructure sectors, making the country a high-risk investment destination as policymakers have lost out on IndiaĆ¢ā¬ā¢s big advantage as an investment destination, Nasser Munjee, Chairman, Development Credit Bank Ltd
Tata Power to run Mundra UMPP at low capacity
Tata Power Company is preparing contingency plans to minimise loss from running the plant as the cost of imported coal from Indonesia has risen sharply. The company plans to run the 4,000-MW Mundra unit at low capacity, at around 72-78 percent, and is considering blending the fuel with cheĆĀaper coal of low calorific value to reduce cost of generation.
Power Min demands gas for 8 projects
Towards meeting the production of 3,153.5 MW of electricity, through gas, in the 11th Plan period, the Power Ministry has asked the Petroleum Ministry to expressly consider allocating 16.23 million metric standard cubic metre per day (mmscmd) of gas.
- 1
- 2

