To emerge as a developed nation by 2047 focus on the 4 pillars is pertinent While infrastructure and investment provide the necessary support systems, innovation and inclusivity drive the development of new technologies and industries. Hence, incentivising these four factors is crucial for national economic growth, writes Sneha Gurjar, Director, CEM Engineers. According to a recent...
FlashNews:
Karnataka Partners with SIA-India to Launch India’s First State-Led Space Technology Centre
IndiGo Expands UK Reach with More Flights to Manchester and London Heathrow
ENGIE Secures 100 MW Solar PPA with SECI, Expands Rajasthan Portfolio to 1 GW
Air India Adds Fourth Daily Delhi-London Flight, Expands UK Network for Winter 2025
IMC 2025: Scindia Highlights India’s Digital Leap in Manufacturing, Startups
Lotus Takes Flight: Mumbai’s Aviation Horizon Expands as PM Modi Launches Navi Mumbai International Airport
NMIA Ripple: Real Estate Activity Accelerates Across Panvel and Navi Mumbai
Avaada Group Commits ₹360 Billion to Gujarat’s Green Energy Push at Vibrant Gujarat 2025
India’s Solar Push Goes Local: Minister Joshi Highlights People-Centric Energy Transition at ISA Curtain Raiser
IndiGo Unlocks Nordic Gateway with Direct Mumbai-Copenhagen Flights
IMC 2025: Satcom Summit Calls for Space Networks to Bridge Digital Divide
Air India-STARLUX Interline Deal Opens Seamless Access to Taiwan via Southeast Asia Gateways
Sembcorp to Acquire ReNew Sun Bright, Expanding India Solar Portfolio to 6.9 GW
Indian Railways Achieves Record Capex Utilisation in H1 FY26; Safety and Network Expansion Lead Spend
IMC 2025: Modi Urges Indian Tech Leaders to Scout Global Gaps and Make for the World from Bharat
IMC 2025: Scindia Positions India as Telecoms Launchpad for Global Innovation and Scale
Modi Government Clears ₹12 Trillion Infrastructure Push in Third Term, Says Vaishnaw
Over ₹109 Billion in Rooftop Solar Loans Sanctioned Under PM Surya Ghar Scheme
India Flags Third VLGC ‘Shivalik’ as Maritime Push Gains Momentum
Home » PV systems
Tag: PV systems
Solar energy: 100 GW Target
On June 17, 2015, the Centre approved the proposal to boost the country´s solar power capacity target under the National Solar Mission by five times, to achieve 100 GW by 2022