In Kozhikode district of Kerala, about 1,000 km of roads that were damaged due to the recent rains will be repaired on a war-footing within the next 15 days by spending Rs 72 crore. The State government has doubled the fund allocated to carry out the repair works from Rs 36.7 crore to Rs 72 crore considering the extensive damage caused by this year's monsoon on the district's roads.
FlashNews:
Indiaās Infrastructure Investments to Surge 50% Despite Global Uncertainties: Crisil Ratings
Future of Himalayas White Paper Calls for Systemic Shift in Development and Resilience
Global Wind Installations Surge 40% as Sector Charts Path Beyond Energy Crisis
Siemens Ushers in Industrial AI Transformation with Eigen Engineering Agent at Hannover Messe
India and Asian Markets Adapt to Middle East LNG Disruption: S&P Global Energy
Polaris Smart Metering Secures $80 Million BII Financing to Accelerate Indiaās Smart Meter Rollout
Delhi Airport Unveils MultiāLingual Passenger Guide Under #DELCares
POWERGRID Wins Green World Award 2026 for Climate Change Excellence
Reflections for Safer Roads: The Science of Conspicuity
JAKSON Group Unveils Five Energy Solutions, Eyes Over ā¹90āÆBillion Growth for FY2026ā27
StarāÆAir Launches 70āÆWeekly Flights, Introduces FirstāEver Direct Mundra-DelhiāÆNCR Route
Indiaās Data Centre Market to Double, Crossing $22 Billion by 2030: Vestian
āRVNL Delivers 17,000 km Rail Projects, Executes ā¹2 Trillion Infrastructure:ā Railway Board CEO
Qatar Pledges Deeper Energy Ties with India During Puriās Doha Visit
IRB Group Reports ā¹8.3 Billion FY2026 Toll Revenue, Secures 10% National Share
India and Bhutan Sign Tariff Protocol for PunatsangchhuāII, Strengthening Hydropower Partnership
IndiGo, Digi Yatra and BIAL Pioneer Indiaās First International Contactless Travel Trials with IATA
India-Bhutan Hydropower Push: Minister Manohar Lalās 4-Day Visit to Drive Projects, Trade
India Slashes Airport Charges to Shield Domestic Airlines from ATF Surge Amid West Asia Conflict
Tag: rains
Goa to take up road repairs from Sept 15
The Goa government will take up road repairs from September 15. Roads battered by rains will be taken up for repairs and those road contracts with three-year warranty period will be repaired by the contractors concerned at their cost. The State Public Works Department (PWD) will undertake temporary repairs as soon as the rains recedes.
Rain exposes quality of road works in Hubli
In Hubli, the recent rains have made the lives of vehicle-users and pedestrians miserable, thanks to the severe beating several roads have taken. Major roads in the city have either caved in or developed huge potholes, because of the poor quality of repair works.
The Hubli-Dharwad Municipal Corporation (HDMC) undertook road repair works under the Rs 100 crore special grant. It got this grant twice for the development of Hubli-Dharwad twin cities, of which, Rs 64 crore had been spent on repairin
Soon, audit cell for road projects in Delhi
In Delhi, the problems of potholes and craters on the newly constructed roads or entire stretches caving in after rains will soon be addressed.

