Drivers of electric vehicles may not have to worry about running out of charge on the 820km Mumbai Nagpur route MSEDCL plans to set up 50 e-charging stations
FlashNews:
Delhi Airport Expands Domestic Network to 90 Destinations with Launch of Direct Flights to Daman
Jupiter Wagons, Lucchini RS to Build India’s First Fully Integrated Private‑Sector Railwheel Manufacturing Platform
Willie Walsh Takes Charge as IndiGo CEO
Indian Railways Posts 9% Freight Growth in July 2026
PM Modi Dedicates POWERGRID Transmission Projects for Clean Energy in Andhra Pradesh
AM/NS India Highlights Long‑Life Solar Infrastructure with Magnelis for 300 GW Ambition
RECPDCL Hands Over Ryapte Transmission SPV to Tata Power
India’s Rooftop Solar Push Accelerates as PM Surya Ghar Nears 5 Million Homes
PM Modi Looks East to Future After Bhogapuram Airport Unveiling
India Approves ₹50.7 Billion Scheme for Floating Solar Projects with Energy Storage
Air India, SkyDrive, and Suzuki Join Forces to Explore eVTOL Medical Logistics in India
REC, PFC Seal ₹268.5 Billion Loan Deal for 2,400 MW Meja Thermal Project
Tata Power Renewables Breaks Ground on 800 MW Hybrid Project in Andhra Pradesh
RECPDCL Transfers Two Key Power Transmission SPVs to Power Grid and Terralight Solar
Inox Wind Wins ₹16 Billion Repeat Order from NLC India for 200 MW Project
GAIL and RCF Ink Pact to Build 1.27 MMTPA Gas‑Based Fertiliser Plant in Maharashtra
Texmaco, Touax, TrinityRail JV to Invest ₹18 Billion in 100 Rakes to Boost Railcar Leasing
India’s Aviation Minister Pushes Cost‑Effective SAF Rollout From 2027
Vedanta Uses 4 Billion Units of Clean Energy in FY2026, Cuts Emissions
Home » Ratnagiri
Tag: Ratnagiri
Private sector leads power capacity additions
The private sector developers accounted for much of the power capacity addition that has taken place so far this fiscal. During April-October 2011, the private sector added 4,301 MW, more than what was added by the public sector utilities put together.
No takers for high cost power from Dabhol's project
Ratnagiri Gas and Power’s plan to add another 2,100 MW of generating capacity at its Dabhol plant is apparently stuck as Maharashtra government is unwilling to pay more for the supply.

