The ministry finishes 218 ponds renovation under Bundelkhand package
FlashNews:
Air India, Akasa Join IndiGo in Raising Fares as ATF Costs Surge 25%
Tata Power Partners with Norway’s Ocean Sun to Pilot Membrane‑Based Floating Solar in India
New Relic Rolls Out Infrastructure 360 for Faster, Smarter AI Operations
Inox Green Completes ₹5.5 Billion Acquisition of Wind World’s 4.5 GW O&M Business
Air India, Singapore Airlines Deepen Partnership to Expand Travel Options, Loyalty Benefits
Alok Tiwari Takes Additional Charge as DFCCIL MD, Pushes Tech‑Driven Freight Corridor Agenda
India Launches Integrated Transport & Logistics Authority to Cut Costs and Boost Connectivity
India’s Infrastructure Future Hinges on Making Projects Investable and Tech‑Driven: Deloitte Survey
FLY91 Expands Regional Network with Ceremonial Touchdown at Navi Mumbai International Airport
Brahmaputra Set to Reclaim Global Role as Dibrugarh Sends First Cargo to Bangladesh
IndiGo Raises Fares as ATF Costs Surge
India Becomes Veolia Foundation’s Regional Emergency Response Hub for Asia-Pacific
Airtel Business Unveils IQ Gateway to Secure Enterprise Messaging at Scale
POWERGRID Veteran Akhilesh Pathak Takes Charge as Director Projects
India Rolls Out $28 Billion GOBARdhan Biogas Plan to Cut Imports, Boost Rural Economy
India’s Civil Aviation Demand is Outpacing Supply: Kinjarapu Ram Mohan Naidu
INDIA’S INFRA STORY IS SHIFTING TRACKS
India’s Green Hydrogen Mission Chief Urges Industry to Back Emerging Ecosystem
Global Trust as Essential as Scale in Green Hydrogen: Pralhad Joshi
Home » renovation work
Tag: renovation work
Plea to complete repairs on Zelengbung-Sinakeithei road
Sagolmang Naga Students' Association (SANSA) in Manipur has appealed for finishing the development and renovation work on Zelengbung-Sinakeithei road stretch at the earliest possible. SANSA explained about the problems being faced by commuters on the stretch. In a statement, Z Reithingam, president, SANSA informed that during an inspection visit, volunteers of the Association found that black topping from Zelenbung and Sinakeithei included in the work programme of 2010-11 under SPA is yet to be


